With 4 records since Nov 2026 there is too little history for charts or rankings, so the page shows the records themselves.
| Construction of 40m long gabion wall (DS-Right side ) in OR 1 anicut D/S Chainage at 0+150 P canal in Hamaragoda Scheme. |
| Won |
| LKR 4m |
| 18 Nov | Construction of 50m length canal lining in D4 canal from 0+900 km to 0+950km (Breach section along Weherahena Main road)in Kekanadura Scheme | Won | LKR 3.3m |