Nothing open for bids right now.
| Published | Notice | Type | Status | Category | Value |
|---|---|---|---|---|---|
| 24 Jun | Multi-Party Framework for Architect and Engineer Led Integrated Design Teams in 2 Lots (Lots 3 and 4) / Creatlacha Ilpháirtí d’Fhoirne Deartha Comhtháite faoi stiúir Ailtire agus Innealtóra i 2 mhír | EF29 | Awarded | Architectural, construction, engineering and inspection services | €6m |
With 1 record since Jun 2026 there is too little history for charts or rankings, so the page shows the records themselves.