| Published | Notice | Buyer | Result | Offer |
|---|---|---|---|---|
| 7 Oct | Design and build of two climate-resilient long span bridges and their link roads - Lot 1 | Won | US$24.2m | |
| 7 Oct | Design and build of two climate-resilient long span bridges and their link roads - Lot 2 | Not won | US$23.2m |
With 2 records since Oct 2026 there is too little history for charts or rankings, so the page shows the records themselves.