| Published | Notice | Buyer | Result | Offer |
|---|---|---|---|---|
| 21 Oct | Consultancy service for conducting technical and Feasibility study for Construction of Retaining Walls | Won | RWF 45m | |
| 20 Oct | Consultancy services for supervision of Construction works to upgrade TTC Bicumbi in Rwamagana District | Not won | RWF 57m | |
| 16 Oct |
With 9 records since Oct 2026 there is too little history for charts or rankings, so the page shows the records themselves.
| : Consultancy services for the feasibility study to upgrade 16 existing Model Schools (Lot 16: GS Umubano II) |
| Not won |
| RWF 13.9m |
| 16 Oct | Consultancy services for the feasibility study to upgrade 16 existing Model Schools (Lot 15: EP Rubengera I) | Not won | RWF 13.9m |
| 16 Oct | Consultancy services for the feasibility study to upgrade 16 existing Model Schools (Lot 14: GS Muramba) | Not won | RWF 13.9m |
| 16 Oct | Consultancy services for the feasibility study to upgrade 16 existing Model Schools (Lot 12: GS Nyarusange) | Not won | RWF 13.9m |
| 16 Oct | Consultancy services for the feasibility study to upgrade 16 existing Model Schools (Lot 7: GS Saint Jean de la Mennais) | Not won | RWF 13.9m |
| 16 Oct | Consultancy services for the feasibility study to upgrade 16 existing Model Schools (Lot 6: GS BYUMBA Catholique) | Not won | RWF 13.9m |
| 1 Oct | Feasibility Studies for Construction of RetainingWalls-BURERA | Won | RWF 45m |