With 1 record since Aug 2026 there is too little history for charts or rankings, so the page shows the records themselves.
With 1 record since Aug 2026 there is too little history for charts or rankings, so the page shows the records themselves.
Notices published
1
since Aug 2026
Last 3 months
0
since 1 Sept
Open for bids
0
none right now
Nothing open for bids right now.
| Published | Notice | Type | Status | Category | Value |
|---|---|---|---|---|---|
| 28 Aug | RZP/14/TP/D/2026 Dostawa oraz pierwsze ustawienie mobilnych ścianek działowych aluminiowo-szklanych zgodnie z projektem” Projekt wykonawczy ścianek wewnętrznych mobilnych w pomieszczeniach MHP | ContractNotice | Under evaluation | Construction structures and materials; auxiliary products to construction (except electric apparatus) | €84.9k |
Notices published
1
since Aug 2026
Last 3 months
0
since 1 Sept
Open for bids
0
none right now
Nothing open for bids right now.
| Published | Notice | Type | Status | Category | Value |
|---|---|---|---|---|---|
| 28 Aug | RZP/14/TP/D/2026 Dostawa oraz pierwsze ustawienie mobilnych ścianek działowych aluminiowo-szklanych zgodnie z projektem” Projekt wykonawczy ścianek wewnętrznych mobilnych w pomieszczeniach MHP | ContractNotice | Under evaluation | Construction structures and materials; auxiliary products to construction (except electric apparatus) | €84.9k |