WSC/T/070/2026 - DESIGN, SUPPLY, INSTALL, COMMISSION AND HAND-OVER OF NEW SWRO PLANT “D” AT PEMBROKE RO PLANT USING ENVIRONMENTALLY FRIENDLY MEASURES AND FIDIC CONDITIONS FOR THE WATER SERVICES CORPORATION
Keep momentum on this opportunity
Save it on this device now. Create an account when you are ready to track deadlines, notes, and teamwork.
- Save and reuse search filters
- Track opportunities as pursuits
- Get notified when new notices match
Keep this notice in a shortlist so you can return to it without starting a bid.
Keep notes, monitor deadlines and collaborate with your team. This does not submit a bid or contact the buyer.
Key information
Overview
The project scope is to issue an EU funded tender for the design, supply, install, commission and hand-over of a SWRO Plant located within the existing Pembroke RO Plant at Pembroke, Malta. The Plant’s nominal capacity shall be 11,200 m3/day with a potential maximum capacity of at least 13,000 m3/day produced from two (2) independent and identical RO systems. During installation, testing and up to the commissioning of the new plant, the existing SWRO plant and its’ ancillary equipment shall remain in operation, and production shall not be jeopardized. The Contractor/s shall be responsible for all mechanical and electrical works to construct this plant to the specified capacities.