TR5844 - Poolbeg CCGT Auxilliary Boiler Major Replacement
Keep momentum on this opportunity
Save it on this device now. Create an account when you are ready to track deadlines, notes, and teamwork.
- Save and reuse search filters
- Track opportunities as pursuits
- Get notified when new notices match
Keep this notice in a shortlist so you can return to it without starting a bid.
Keep notes, monitor deadlines and collaborate with your team. This does not submit a bid or contact the buyer.
Key information
Overview
Poolbeg CCGT Auxilliary Boiler Major Replacement The Contracting Entity intends to replace its dual fuel auxiliary steam boiler, controls, external gas skid during 2027 owing to age, condition and obsolescence. The project will require some works to the building structure together with removal of plant and equipment to facilitate removal of the existing boiler and the installation of the new designed equipment. Whilst every effort will be made to use the existing civil works foundations, the design may require modifications to same. The design will include interfacing with electrical, gas, diesel, C and I, fire, civil, structural, ventilation, steam, feedwater and other systems.
Lots1
Documentation4
- 1.9 MB
TR5844 - Poolbeg CCGT Auxilliary Boiler Major Replacement (notice).pdf
PDF document
- 1022.6 KB
TR5844 PQQ Cover Letter.docx
Word document
- c4t_8994117_1.xml825 B
XML document