TII424: OCS Works Framework Agreement

can-socialContract or concession award notice – light regime00589175-2026T(Transport Infrastructure Ireland (TII)
1,372 days left
Estimated value€90,000,000
Deadline1,372 days left21 Jul 2030, 23:00
Competition00 participants
Lots11 lot

Keep momentum on this opportunity

Save it on this device now. Create an account when you are ready to track deadlines, notes, and teamwork.

  • Save and reuse search filters
  • Track opportunities as pursuits
  • Get notified when new notices match
Quick actions

Keep this notice in a shortlist so you can return to it without starting a bid.

Keep notes, monitor deadlines and collaborate with your team. This does not submit a bid or contact the buyer.

Receive alerts

Key information

Identifier
Contract type
—
Deadline
21 Jul 2030, 23:00
CPV codes
45234100 - Railway construction works45234127 - Tramway depot construction work45234128 - Tramway platforms construction work45234129 - Urban railway track construction works
Status
Awarded
Notice type
can-socialContract or concession award notice – light regime
Source
Estimated value
€90,000,000
Publication date
25 Aug 2026, 22:00

Overview

TII intends to enter into a Single Party Framework Agreement for renewals (Overhead Contact System) on the Luas light rail system. This framework, when established, will be available to TII to draw down from it on a Call-Off Contract basis. The Call-Off Contracts, when issued, will typically be for the purposes of carrying out the following activities:1. Design, supply, installation, testing and commissioning of any Overhead Contact System asset renewals, upgrades or new works. It shall include developing a detailed construction design associated with the various work elements of the Overhead Contact System installations on Luas 2. Developing the specific programme of works, 3. Developing the specific methodology – location based, 4. Developing the Traffic Management design – to be approved by the relevant Local Authority, TII and the Luas Operator, 5. Interface with Luas Operator and Maintainer as required, 6. Carrying out all the necessary works as specified for the Overhead Contact System and/or associated equipment and installations on Luas. Those works will include all preparatory works and all closing out works to make good the affected assets, 7. Production of the Safety File, 8. Supply of materials including contact wire and overhead system components and tooling e.g. Section insulators, cabling, fixings, poles, track interfacing equipment, sealants/grouts and materials used for works on or near the Luas system, and 9. Any other associated works required by the Client; including work on overhead contact system and traction power related equipment such as overhead contact system elements, cabling including traction cables, earthing and bonding systems (e.g. VLDs etc), installation, purchase, interventions of similar equipment, work on on-track-plant, supply of and interventions on tooling, interventions on overhead contact systems such as replacing contact wire, adjusting overhead support systems, work on supporting systems and additional items on surrounding building such as poles and building supports and all works on or near Luas OHLE (Overhead line equipment) asset group, 10. Provide a handover file and as-built drawings in accordance with TII requirements . 11. Carrying out the duties of PSDP and PSCS for all Call off Contracts. TII are inviting expressions of interest from interested parties to be selected to tender with a view to entering into the Contract. Applicants are referred to the Information Memorandum and Pre-qualification Questionnaire (IMPQQ) which provides additional information in relation to the competition. Provided that there is a sufficient number of suitable Applicants, TII intends to invite the number of Applicants (as indicated in this IMPQQ) to tender. Prior to shortlisting any Applicant, TII reserves the right to seek verification of any declarations made in the response to the ESPD/IMPQQ.

Contracting authorities1

Lots1

Documentation0

The source system does not support document syncing.

Award criteria0

No procedure-level award criteria recorded.

Participants0

No participants recorded for this notice.