Please see RFP (tcsd_y20_rfp_c2) for full details. Highlights:MANDATORY Walk Throughs on the appropriate days - Nov 3, 4, 525,200 feet fiber cabling570 feet fiber patch cables41,017 feet copper cabling2244 feet copper patch cables105 switches364 access points10 access point controllers29 Racks/Cabinets Active elements hardware purchase contract will be separate from installation contract(s).Cabling materials and installation will be on same contract(s).