Supply of Wastewater Sample Systems

UK3Planned procurement notice088976-2026ULUnited Utilities Water Limited
222 days left
Estimated value£0
Deadline222 days left31 May 2027, 15:00
Competition00 participants
Lots11 lot

Keep momentum on this opportunity

Save it on this device now. Create an account when you are ready to track deadlines, notes, and teamwork.

  • Save and reuse search filters
  • Track opportunities as pursuits
  • Get notified when new notices match
Quick actions

Keep this notice in a shortlist so you can return to it without starting a bid.

Keep notes, monitor deadlines and collaborate with your team. This does not submit a bid or contact the buyer.

Receive alerts

Key information

Identifier
Contract type
—
Deadline
31 May 2027, 15:00
CPV codes
38434000 - Analysers38300000 - Measuring instruments38432000 - Analysis apparatus38800000 - Industrial process control equipment and remote-control equipment
Status
Planned
Notice type
UK3Planned procurement notice
Estimated value
£0
Publication date
21 Sept 2026, 09:03

Overview

United Utilities require the standardisation of the final effluent monitoring stations as part of UU's Project Blueprint programme. Project Blueprint is UU's strategic standardisation programme, focused on creating and deploying standardised assets, systems and solutions across the business. By adopting an industrialised approach to the design, procurement and delivery of assets, Blueprint aims to reduce engineering and commercial effort, improve delivery efficiency, lower whole-life costs and carbon emissions, and enhance operational consistency. All wastewater treatment works require final effluent monitoring. As part of AMP8 we have a large number of sites picking up numeric and phosphorous consents for the first time. Due to these 'first time' and additional consent projects are also coupled with a need to replace/update existing sites monitoring equipment sample systems are required for wastewater. Scope; To provide packaged final effluent monitoring stations using UU Framework Instruments. Instruments/displays are required to be mounted within a GRP kiosk on a suitable backboard arrangement. Variants include but are not limited to; To cover 'standard' sanitary determinants using turbidity (BOD, COD, Suspended Solids) To cover Ammonia & pH To cover p-removal - phosphorous (P and Fe), with space to add pH as an option

Renewal: Maximum term of 10 years, with an initial term of 5 years.

Procurement Act 2023

Competitive flexible procedure

Utilities

Details of the framework operation are currently being finalised however is likely to be a framework agreement. The procurement documents will provide further information on the proposed framework structure, duration, supplier appointment arrangements, and call-off procedures.

https://uk.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=109284&TID100114329&B=

Contracting authorities1

UL

PPON PVVB-5589-BWHX

gbWarrington, United Kingdom
[email protected]

Lots1

Documentation0

Documents have not been synced yet. Last checked 21 Oct 2026, 22:35.

Award criteria0

No procedure-level award criteria recorded.

Participants0

No participants recorded for this notice.