SA242 Penallta Road Bridge Strengthening

8 days left
Estimated value£600,000
Deadline8 days left30 Oct 2026, 14:00
Competition00 participants
Lots11 lot

Keep momentum on this opportunity

Save it on this device now. Create an account when you are ready to track deadlines, notes, and teamwork.

  • Save and reuse search filters
  • Track opportunities as pursuits
  • Get notified when new notices match
Quick actions

Keep this notice in a shortlist so you can return to it without starting a bid.

Keep notes, monitor deadlines and collaborate with your team. This does not submit a bid or contact the buyer.

Receive alerts

Key information

Identifier
Contract type
—
Deadline
30 Oct 2026, 14:00
CPV codes
45221000 - Construction work for bridges and tunnels, shafts and subways45220000 - Engineering works and construction works45262310 - Reinforced-concrete work
Status
Active
Notice type
UK4Tender notice
Estimated value
£600,000
Publication date
5 Oct 2026, 15:13

Overview

Caerphilly County Borough Council (CCBC) is seeking to appoint an external suitably qualified and experienced Principal Contractor to undertake works to Penallta Road Bridge, Penallta Road, Ystrad Mynach, Hengoed, Caerphilly County Borough, Wales, CF82 7GN. CCBC’s Engineering Projects Group (EPG) is the client for this project and will oversee the works. The proposed strengthening solution comprises the construction of a reinforced concrete box structure designed to provide long-term support to the existing asset. Any voids between the existing structure and the new reinforced concrete box will be infilled with foam concrete to ensure full load transfer and structural continuity. Permanent formwork will be utilised, consisting of blockwork construction with blue pennant stone cladding to all exposed faces, mechanically tied at both end elevations to provide a durable and aesthetically sympathetic finish. It should be noted that the existing superstructure will remain in situ. However, the introduction of the reinforced concrete box and associated infill will fundamentally alter the structural arrangement and load-bearing behaviour of the asset when compared with its current configuration.

Procurement Act 2023

Below threshold - open competition

https://supplierlive.proactisp2p.com/Account/Login

Contracting authorities1

CC

PPON PWHP-2369-JPYL

gbHengoed, United Kingdom
[email protected]

Lots1

Documentation0

Documents have not been synced yet. Last checked 22 Oct 2026, 04:55.

Award criteria0

No procedure-level award criteria recorded.

Participants0

No participants recorded for this notice.