Roofing with Mechanical and Electrical Services upgrade works to existing North Building of Dundalk Institute of Technology

EF29Contract award notice – general directive, standard regime664381c1-7e2e-45fc-8b89-c1854503c0ebDTDundalk Institute of Technology_1155
Estimated value€3,500,000
Deadline—
Competition11 participant
Lots11 lot

Keep momentum on this opportunity

Save it on this device now. Create an account when you are ready to track deadlines, notes, and teamwork.

  • Save and reuse search filters
  • Track opportunities as pursuits
  • Get notified when new notices match
Quick actions

Keep this notice in a shortlist so you can return to it without starting a bid.

Keep notes, monitor deadlines and collaborate with your team. This does not submit a bid or contact the buyer.

Receive alerts

Key information

Contract type
—
Deadline
—
CPV codes
45000000 - Construction work45214000 - Construction work for buildings relating to education and research45261210 - Roof-covering work45261900 - Roof repair and maintenance work45310000 - Electrical installation work
Status
Awarded
Notice type
EF29Contract award notice – general directive, standard regime
Source
Estimated value
€3,500,000
Publication date
3 Sept 2026, 23:00

Overview

The existing roof covering membranes to the North Building are reaching the end of their economic life and require replacement. Some areas of the existing roof have insufficient thermal properties due to the absence of insulation and as part of the roofing upgrade works it is proposed to upgrade the thermal properties of the existing structure through the installation of an insulation layer below the new roofing membrane. In addition, the existing M and E Services infrastructure is in need of upgrading and bringing up to modern standards. The scope of works will also includes the installation of roof membrane/flashing to up-stands/parapets to the roof and refurbishment and replacement of existing rainwater goods as necessary. The removal of existing Asbestos containing materials as identified in Asbestos Survey Report including certified removal and disposal of identified materials or any other materials identified during course of works. The removal of both existing roof lights and removal of existing water tank rooms and the reinstatement of the roof structure and coverings to these areas and introduction of new AOV's above stair cores along with the replacement of a number of existing roof lights. Creation of new window opes in existing lecture rooms and provision of windows to same. Works to an existing Plant Room to accommodate larger water tank/ pumps including upgrade of existing structure and enclosure and the boilers in the existing boiler house are to be replaced along with the requirement to insulate the floor in plant area, also installation of new Air Source Heat Pump equipment to augment and replace existing boiler plant. Removal and disposal of obsolete plant along with removal and re installation of other plant and ducting to accommodate the roof works will be required and involve electrical works. M and E works required to all areas and to allow the removal of water tank enclosures including new water pipework distribution network in first floor ceiling void and associated builders works. Provision of a fall arrest system to the perimeter of roof The works will be undertaken in a single continuous phase which will commence in September

Contracting authorities1

DT

IE-REGISTRATION-NUMBER IE 4598992U

ieDUNDALK, Ireland
[email protected]

Lots1

Documentation9

9 documents

Award criteria1

Criterion information

Name
Quality
Weight
0% (0 of 100)
Order number
#0
Price criterion
No
Directly proportional
Yes
Description
Price 70% Quality £0% Description of the method to be used if weighting cannot be expressed by criteria: Most Econmoically advantageous tender

Participants1