RFI2 24kV Ring Main Units

EF04Prior information notice used only for information – general directiveb9f465b6-fb68-445d-bb95-04238770883eSTStedinRRRechtbank Rotterdam
Estimated value€0
Deadline—
Competition00 participants
Lots11 lot

Keep momentum on this opportunity

Save it on this device now. Create an account when you are ready to track deadlines, notes, and teamwork.

  • Save and reuse search filters
  • Track opportunities as pursuits
  • Get notified when new notices match
Quick actions

Keep this notice in a shortlist so you can return to it without starting a bid.

Keep notes, monitor deadlines and collaborate with your team. This does not submit a bid or contact the buyer.

Receive alerts

Key information

Contract type
—
Deadline
—
CPV codes
31210000 - Electrical apparatus for switching or protecting electrical circuits31212000 - Circuit breakers31214000 - Switchgear31214100 - Switches45315500 - Medium-voltage installation work
Status
Planned
Notice type
EF04Prior information notice used only for information – general directive
Source
Estimated value
€0
Publication date
7 Oct 2026, 12:44

Overview

This request for information is intended for investigating: * The availability of SF6-free Ring Main Units (RMUs) to be implemented in the Stedin distribution grid. * The feasibility of Stedin requirements that are currently under construction. The RMUs must have a rated voltage of 24kV, rated busbar current of 630A and able to resist 20kA/1 short-circuit current. All RMUs are composed from a combination of Load Break Switch feeders and Circuit Breaker feeders. Fuse feeders are out of scope. The RMUs are intended to be used as: * Standard 3 panel configurations in ring topology with self-powered protection relay. - 630/1000kVA distribution stations. - ≤1750kVA client connections with metering. * Standard configurations with protection relay requiring auxiliary voltage. - 3-panel for client connections 1.75-10.00MVA with metering. - 6-panel configurations. * Freely-configurable single panel designs for brownfield/renovation purposes. The RMUs will be both applied in prefabricated substations with downwards pressure relief and traditional substations with upwards pressure relief. The RMUs are to be delivered at the Stedin warehouse. Installation and commissioning is intended to be Stedin scope.

This request for information is intended for investigating: * The availability of SF6-free Ring Main Units (RMUs) to be implemented in the Stedin distribution grid. * The feasibility of Stedin requirements that are currently under construction. The RMUs must have a rated voltage of 24kV, rated busbar current of 630A and able to resist 20kA/1 short-circuit current. All RMUs are composed from a combination of Load Break Switch feeders and Circuit Breaker feeders. Fuse feeders are out of scope. The RMUs are intended to be used as: * Standard 3 panel configurations in ring topology with self-powered protection relay. - 630/1000kVA distribution stations. - ≤1750kVA client connections with metering. * Standard configurations with protection relay requiring auxiliary voltage. - 3-panel for client connections 1.75-10.00MVA with metering. - 6-panel configurations. * Freely-configurable single panel designs for brownfield/renovation purposes. The RMUs will be both applied in prefabricated substations with downwards pressure relief and traditional substations with upwards pressure relief. The RMUs are to be delivered at the Stedin warehouse. Installation and commissioning is intended to be Stedin scope.

Contracting authorities2

ST

UNKNOWN 24289101

nlRotterdam, Netherlands
[email protected]
1 / 2

Lots1

Documentation0

Documents have not been synced yet. Last checked 24 Oct 2026, 22:45.

Award criteria0

No procedure-level award criteria recorded.

Participants0

No participants recorded for this notice.