Quarrying - North District

UK4Tender notice097659-2026FCForestry Commission
19 days left
Estimated value£2,416,500
Deadline19 days left9 Nov 2026, 12:00
Competition00 participants
Lots22 lots

Keep momentum on this opportunity

Save it on this device now. Create an account when you are ready to track deadlines, notes, and teamwork.

  • Save and reuse search filters
  • Track opportunities as pursuits
  • Get notified when new notices match
Quick actions

Keep this notice in a shortlist so you can return to it without starting a bid.

Keep notes, monitor deadlines and collaborate with your team. This does not submit a bid or contact the buyer.

Receive alerts

Key information

Identifier
Contract type
—
Deadline
9 Nov 2026, 12:00
CPV codes
45111212 - Rock-removal work45111211 - Blasting work
Status
Active
Notice type
UK4Tender notice
Estimated value
£2,416,500
Publication date
15 Oct 2026, 15:54

Overview

Quarrying works in the north of England comprise extraction and processing of aggregate from hard rock quarries, including associated drilling and blasting works. Materials are extracted in relatively small quantities and used in various Forestry England civil engineering applications, mostly for the construction and maintenance of forest roads for the purposes of facilitating timber harvesting. Quarrying operations are therefore undertaken in a number of specific locations, in close proximity to the point of use of the extracted materials. Typically, extraction of materials will take place over a period of a few weeks each year, with material then stockpiled within the quarry, or at other designated locations for use as and when needed. This Framework is divided in to 2 Lots: Lot 1 - Drilling and blasting Lot 2 - Extraction and processing/crushing

The Supplier carries out all drilling and blasting operations, in accordance with the Quarries Regulations 1999 particularly Part V and the Explosives Regulations 2014 , and the quarry Health and Safety Document. Blasting activities typically take place at 2 to 5 sites per year, with tonnages between 20,000 and 35,000T per blast. The Client (The Operator) will retain 8.1.(c) responsibilities during blasting operations. The Supplier’s named individual will be appointed as the 8.1. (d) and the client will also appoint the Supplier’s named individual as the Explosives Supervisor under regulation 25 of the Quarries Regulations for the duration of the Work Order. This requires the Supplier to have capability in the following areas: 1. Provide suitably qualified, competent and qualified personnel to undertake the following duties:  Explosives Supervisor  Shotfirer  Driller  Blast Designer  Face profiler  Trainee Shotfirer (if required)  Handing of explosives  Transportation of explosives 2. Provide all required survey work relating to the blasting operation. 3. Provide all plant and equipment required including fuels, oils, transportation, explosives and accessories (except those items mentioned below that will be supplied by the Client). Provide testing certification under PUWER regulations for plant and equipment used during operations. 4. In the event of a misfire undertake all works to make the situation safe, including provision of all plant and equipment. 5. Provide vibrographs and operator if required. 6. Produce a blast design and full report for each blast. Unless otherwise agreed the Client provides all stemming materials, prepares the blast area to an agreed standard and provides suitable operated plant for the distribution of stemming material. The Client also provides all relevant Geotechnical information and maps required, undertakes any appointments and provides the Supplier with sentries and means of communication on the day of each blast. Forestry England retains the Regulation 8(1)(c) competent individual, while the Supplier’s named person is formally appointed as the Regulation 25 Explosives Supervisor. Award criteria: Lot 1 - Drilling and blasting Quality – Total 70% Professional Competence - 40% Framework Delivery & Management - 20% Environment and Sustainability - 10% Price – Total 30% Full details are contained in the Invitation to Tender.

The Supplier carries out all extraction and processing, in accordance with the Quarries Regulations 1999, and the quarry Health and Safety Document. The Client (The Operator) will retain 8.1.(c) responsibilities during operations. The Supplier’s named individual will be appointed as the 8.1. (d) deputy quarry manager to supervise the works for the duration of the Work Order. The Client requires the Supplier to carry out the following services to facilitate the extraction and processing of aggregates at Forestry England quarries: 1. Removal of material from processed stockpiles and blast piles. 2. Excavation of raw materials 3. Processing of raw materials including crushing and screening. 4. Provision of stemming material and plant for movement and placement 5. Maintenance and reinstatement of quarry floor and safety features 6. Maintenance and reinstatement of egress and quarry roads, during quarrying operations 7. Crushing of as blasted material. 8. Loading of aggregate during quarry operations 9. Haulage of aggregate to forest locations 10. Daily inspections as required by the Quarries Regulations in accordance with the Client’s requirements. 11. Soil and overburden excavation, haulage within the quarry and tip creation. 12. Restoration works. The Client retains the Regulation 8(1)(c) competent individual, while the Supplier’s named person is formally appointed as the 8(1)(d) for the duration of the works. Award criteria: Lot 2 - Extraction and processing/crushing Quality – Total 50% Professional Competence - 20% Framework Delivery & Management - 20% Environment and Sustainability - 10% Price – Total 50% Full details are in the Invitation to Tender.

Procurement Act 2023

Below threshold - open competition

Lot 1: Each Work Order will be awarded through a mini-competition between all suppliers appointed to the lot. Lot 2: Work Orders will be awarded directly to the highest-ranked supplier. Where the highest-ranked supplier is unable or unwilling to undertake the Work Order, it will be offered to the second-ranked supplier. Full details contained in Volume 1 - Framework Information

https://app.panacea-software.com/ForestryCommission/eRFX-Suppliers/OpenReq.aspx?requirementId=86f8bf3c-d98a-4e27-8492-1dae61074390

Contracting authorities1

FC

PPON PLRM-7846-HGLG

gbBristol, United Kingdom
[email protected]

Lots2

Documentation0

Documents have not been synced yet. Last checked 21 Oct 2026, 19:22.

Award criteria0

No procedure-level award criteria recorded.

Participants0

No participants recorded for this notice.