PRO005166 - ORiW - Design and Integration Partner

UK2Preliminary market engagement notice099229-2026ULUnited Utilities Water Limited
5 days left
Estimated value£600,000,000
Deadline5 days left27 Oct 2026, 23:59
Competition00 participants
Lots11 lot

Keep momentum on this opportunity

Save it on this device now. Create an account when you are ready to track deadlines, notes, and teamwork.

  • Save and reuse search filters
  • Track opportunities as pursuits
  • Get notified when new notices match
Quick actions

Keep this notice in a shortlist so you can return to it without starting a bid.

Keep notes, monitor deadlines and collaborate with your team. This does not submit a bid or contact the buyer.

Receive alerts

Key information

Identifier
Contract type
—
Deadline
27 Oct 2026, 23:59
CPV codes
71320000 - Engineering design services45111250 - Ground investigation work70332100 - Land management services71000000 - Architectural, construction, engineering and inspection services71242000 - Project and design preparation, estimation of costs
Status
Planning
Notice type
UK2Preliminary market engagement notice
Estimated value
£600,000,000
Publication date
21 Oct 2026, 06:52

Overview

This notice relates to market engagement activity for the provision of certain design and integration services, as explained below. United Utilities Water Ltd (UU) proposes to deliver a programme titled Only Rainwater into Windermere (ORiW), with the ambition to make Windermere the cleanest lake in England by removing discharges from both public and private sources, while also addressing highway runoff. This is a long-term, transformational programme designed to protect the lake's ecology, water quality and amenity value for future generations. The target end state is "Only Rainwater into Windermere", restoring the lake as close as possible to its natural condition and reducing the risk of harmful algal blooms. The programme will deliver resilient wastewater infrastructure that supports communities, businesses and the wider National Park, while creating a potential blueprint for freshwater restoration across England. A coalition has been established to develop and deliver the ORiW feasibility phase. It brings together key stakeholders, including UU, local authorities, regulators and environmental organisations, to provide strategic direction and has sponsored the commission of a ‘feasibility study’ to ascertain the art of the possible for achieving ORiW. Through the commission there are now feasible options for achieving the ambition, to improve water quality, and enhance the environmental resilience of the Windermere catchment, through a proposed ORiW system and wider infrastructure. The proposed ORiW system is made up of multiple workstreams; • First Time Sewerage (FTS), connecting properties to the public sewer network that are currently outside of the network and have never previously been connected to it. • First time Treatment (FTT), for the sites where FTS is not possible, a remote treatment solution will be implemented. • Reduced weather dependent flow, surface water management and management and treatment of highways runoff through the use of nature- based solutions where possible across the catchment. • Construction of tunnel and rising mains. • Upgrade of an existing wastewater treatment works and discharge point. UU anticipates that the ORiW system and the other strategic wastewater transfer and treatment infrastructure required for the ORiW programme (including the tunnel, rising mains, pumping stations, wastewater treatment facilities, associated drainage works and all ancillary infrastructure), will be promoted through a Development Consent Order (DCO) as a Nationally Significant Infrastructure Project (NSIP), subject to Section 35 approval by Defra. UU will shortly be launching a competitive tendering procedure for the appointment of a Design and Integration Partner (D&IP) who will be responsible for supporting the next phase of this programme, designing the ORiW system, including whole system integration, to achieve the programme vision. UU requires the D&IP to complete feasibility, outline design, constructability and other related activities to obtain the necessary approvals and consents for the programme to proceed to the delivery phase for the preferred solution. Accordingly, the D&IP will also be responsible for the delivery of the DCO and planning approvals. As such, the outline design needs to fully support and integrate with the DCO, Town and Country Planning Act (TCPA) and land acquisition and access processes. At a high level, the initial scope of requirements for the D&IP will include, but may not be limited to the following activities across each of the workstreams of the ORiW system; • Outline Design • Planning, Consents and Land • Environmental Impact Assessments (EIA) and surveys • Stakeholder and Customer Engagement • Land Agency, Referencing and Surveying • Preparation and submission of planning applications and all supporting information • Preparation and submission of the DCO and all supporting information • Ground Investigation (GI) • Early Contractor involvement (ECI) • Supporting UU in meeting our reporting requirements with Ofwat UU require a D&IP who has the capability and experience to ensure coordination over integration of all elements of the ORiW system and all other related activities that are required. The D&IP will also need to be capable of leading the overall delivery strategy, managing interfaces across the programme, maintaining design consistency, and ensuring that the complete solution meets the requirements to obtain the necessary approvals and consents. UU is continuing to consider its approach to the delivery phase of the programme and anticipates that it may need ongoing support from the D&IP into the delivery phase to provide continuity throughout the programme lifecycle. The precise form that this ongoing support may take will be dependent on the precise delivery model that UU adopts, but this may include (without limitation): • The D&IP acting as system integrator and detailed design partner to either UU and/or any prime contractor engaged in relation to the programme. • The D&IP acting as a system integrator partner to provide support across different workstreams and work packages forming part of the programme so that the overall programme is delivered as seamlessly as possible. • Providing alternative services to support UU’s client-side management of delivery partners engaged to undertake the delivery phase of the programme. It is also conceivable that the D&IP will not be required to provide any ongoing support during the delivery phase. Anticipated value of each role; • Design & Integration Partner (pre delivery phase) > 4 years = circa £60-100m • System Integrator Partner (during delivery phase) > up to a further 9 years in increments at UUs discretion = circa £100m (subject to CPIH) • System Integrator and Detailed Design Partner (during delivery phase) > up to a further 9 years in increments at UUs discretion = circa £500m (subject to CPIH) Please note that the total value is given as a range (£60m to £600m) which includes the minimum and maximum total estimated values across those roles. As explained above, the system integrator partner (during delivery phase) and system integrator and detailed design partner roles are alternatives and so the combined value of each is not included in the total (only the higher of the two). This notice does not constitute a call for competition, and does not commit United Utilities to undertake any future procurement.

Procurement Act 2023

Utilities

UU would like to invite interested parties to attend a virtual Programme Launch Event that will be held on Thursday 29 October 13:30- 17:00 via Microsoft Teams, to share further information about the ORiW programme and the D&IP procurement. Please note attendees are restricted to 2 individuals per supplier. If you are interested in this opportunity and would like to attend the event, please complete the information requested in the Microsoft form which can be accessed here- https://forms.cloud.microsoft/e/mdBFVcDfdB. Please note the deadline to register your interest to attend this event is Tuesday 27 October 2026 at 2pm. UU reserves the right (but does not currently intend) to extend the market engagement activity to encompass other events or activities (including further virtual and in-person sessions as well as written engagement such as surveys and questionnaires) as required. Suppliers should ensure that they have registered using the means, and by the deadline, described above if they wish to be included in any of those further events or activities.

Contracting authorities1

UL

PPON PVVB-5589-BWHX

gbWarrington, United Kingdom
[email protected]

Lots1

Documentation0

Documents have not been synced yet. Last checked 22 Oct 2026, 03:01.

Award criteria0

No procedure-level award criteria recorded.

Participants0

No participants recorded for this notice.