PEACEPLUS Funded Tender - Girona Project - PEACEPLUS
Keep momentum on this opportunity
Save it on this device now. Create an account when you are ready to track deadlines, notes, and teamwork.
- Save and reuse search filters
- Track opportunities as pursuits
- Get notified when new notices match
Keep this notice in a shortlist so you can return to it without starting a bid.
Keep notes, monitor deadlines and collaborate with your team. This does not submit a bid or contact the buyer.
Key information
Overview
The contract is for the provision of Works Contract in relation to the development works at the Portballintrae Coastal Path (integral part of the Causeway Coast Way/Ulster Way), starts at Portballintrae car park, Beach Rd, Bushmills BT57 8RT. The project at the Portballintrae Coastal Path is located within an area of significant natural and cultural heritage. The Portballintrae Coastal Path follows the coastline, linking Portballintrae to the Giant’s Causeway. The proposed improvement works are aligned with the Client Scope to include the following as a minimum: • Provision of trailhead information hub in main car park, in line with other hubs provided at key recreational sites including Garvagh Forest and Banagher Glen. • General upgrade to furniture and fences in the lower car park area. • Repairs to the Three-Quarter Bridge • Replacement of raised boardwalk alongside River Bush • Repairs to boardwalk paths • Provision of waymarking and seating along route • Provision of visitor monitoring equipment at 2 locations along route The works include for the complete design and construction as contained within the specifications, works information, drawings and schedules. The works contract is for a full Design & Build by the successful tenderer, who will be required to align the design with all Architectural, and Civil / Structural performance specifications provided and obtain all necessary statutory approvals (inclusive of associated fees) and comply with Environmental obligations as detailed in HRA’s and Assent conditions. All works shall be Contractor designed to the minimum performance specifications and liaise with client team to finalise and sign off the final contractor designs. The successful tenderer must be able to demonstrate that they have delivered works contracts of a similar scale and scope previously.
Lots0
Documentation1
- 1.9 MB
PEACEPLUS Funded Tender - Girona Project - PEACEPLUS (notice).pdf
PDF document