P2326 - Micellaneous Drainage Works Framework

UK7Contract details notice095630-2026BCBirmingham City Council
Estimated value—
Deadline—
Competition00 participants
Lots11 lot

Keep momentum on this opportunity

Save it on this device now. Create an account when you are ready to track deadlines, notes, and teamwork.

  • Save and reuse search filters
  • Track opportunities as pursuits
  • Get notified when new notices match
Quick actions

Keep this notice in a shortlist so you can return to it without starting a bid.

Keep notes, monitor deadlines and collaborate with your team. This does not submit a bid or contact the buyer.

Receive alerts

Key information

Identifier
Contract type
—
Deadline
—
CPV codes
44611600 - Reservoirs45111240 - Ground-drainage work45232452 - Drainage works45246000 - River regulation and flood control works45246400 - Flood-prevention works
Status
Complete
Notice type
UK7Contract details notice
Estimated value
—
Publication date
9 Oct 2026, 11:27

Overview

A framework for the provision of miscellaneous drainage works. The framework will commence in October 2026 and will be in place for a period of 4 years. Contracts called-off from the framework may extend beyond the expiry date of the framework. Calling-off from the Framework - There are two routes which the Council can utilise to award Call-Off Contracts for the works required, either calling-off without competition or by conducting a further competition. - Call-off without competition - The provider ranked first will be approached to confirm if they are able to meet the Council's timescales and confirm their costs to deliver the works. If they are able to do so, they will be awarded the Call-Off Contract. If they cannot fulfil the requirement the provider ranked second may then be approached and so on. The costs given must be based on the prices submitted as part of the provider's Tender when they joined the framework. - Further competition - All the providers of the framework will be invited to tender for the works. During a further competition, providers may submit more competitive pricing than the pricing submitted as part of the provider’s Tender when they joined the framework. Overview of the Opportunity The Council has adopted the Infrastructure Conditions of Contract Measurement Version 2011 based on the ICE Conditions of Contract 7th Edition together with amendments included (004 attached) within that document by the Council for the purposes of this Framework Agreement. All future call offs under this framework agreement will be done so under the terms and conditions within this document. The scope is related to rivers, brooks, reservoirs, pools and drainage to benefit the local residents and the wider community by improving the environment. The works are to include: • Routine and reactive maintenance work to existing grill structures in watercourses • 24 Hour Emergency clearance work to grill structures and highway culverts. • Construction of new and maintenance of existing flood defense structures. • Repair and reconstruction of brick and other lining to watercourses. • Repair, improvements and rehabilitation to natural watercourses, small pools and large reservoirs. • Small Flood defense schemes • Sustainable drainage schemes and maintenance works • Earthworks, dredging and general environmental works, including in environmentally sensitive areas. • Construction and maintenance of lengths of drains, gullies and manholes. • Resilience work to protect properties. • Other general measures as necessary; e.g. repairs to existing access/egress points into watercourses, tree/vegetation management on embankments to watercourses and dealing with local flooding. • Excavation of existing watercourse channels, embankments, open land, footways and carriageways, including deep excavations. • Flexible pavement and footway construction. • Traffic and pedestrian management. • Installation of new drainage systems and associated manhole constructions. • Bank stabilization works and construction of new retaining structures • Working outside normal office hours, including the provision and placing of sandbags in flood events. • De-watering and flow diversion work. • Protection to existing underground statutory utility and other services and mains. • Safety fencing and associated landscape works. • Work in confined spaces. • Other miscellaneous civil and water engineering works • Drainage maintenance and landscape management

Procurement Act 2023

Open procedure

Calling-off from the Framework - There are two routes which the Council can utilise to award Call-Off Contracts for the works required, either calling-off without competition or by conducting a further competition. - Call-off without competition - The provider ranked first will be approached to confirm if they are able to meet the Council's timescales and confirm their costs to deliver the works. If they are able to do so, they will be awarded the Call-Off Contract. If they cannot fulfil the requirement the provider ranked second may then be approached and so on. The costs given must be based on the prices submitted as part of the provider's Tender when they joined the framework. - Further competition - All the providers of the framework will be invited to tender for the works. During a further competition, providers may submit more competitive pricing than the pricing submitted as part of the provider’s Tender when they joined the framework.

Contracting authorities1

BC

PPON PCJJ-4826-QMLZ

gbBirmingham, United Kingdom
[email protected]

Lots1

Documentation0

Documents have not been synced yet. Last checked 25 Oct 2026, 16:47.

Award criteria0

No procedure-level award criteria recorded.

Participants3