470LVCS2016-C2
Summary
Category Two services
This project and its quantities/scope are subject to funding availability and may change or be canceled depending on costs andother factors. Vendor selection will begin promptly after the 28 day window expires. Bids received after the allowablecontract date will not be considered. In the event that no bids are received in the 28 day window, applicant may extendthat timeline for up to 10 days.2nd location is Pedee campus. Hardware breakdown as follows:1 Firewall edge device and 1 24-port POE switch at each campus6 APs for Pedee, 7 APs for Bridgeport18" equipment cage at each location: 24-port patch panel, rack-mount UPS,Fiber between main building and modular building (to be constructed at Pedee)3 Network Drops per classroom (13 classrooms) - 1 to the AP and 2 to the wall.
Buyer
Who is buying this, and what else they have published.
Timeline
- Passed: Notice published29 Mar 2016, 13:31
- Passed: Bids due26 Apr 2016, 00:00
- Today29 Nov 2026