Back to results
Closed to bids
Estimated valueNot published
ScoringNot published
Category–
LotsOne lotBid on the whole contract
FAFirst State Montessori AcademyWILMINGTON, United States

FSMA Form 470

Summary

Category Two services

First State Montessori Academy is currently accepting proposals from vendors for an enterprise grade wireless solution, associated wiring, caching server, and uninterruptable power supply (UPS) . The scope of project is to provide all necessary permits, hardware, software, licenses, installation and maintenance needed to meet the requirements of the project. For this service to be financially feasible, it will be contingent on qualifying and receiving funding from the Schools and Libraries Division (SLD). Any vendor to be considered for the award for this project must provide a solution meeting all the criteria necessary to provide a functional system, as well as the criteria as required by SLD.All bidders shall be registered as a service provider with the Universal Service Administrative Company-School and Libraries Division (USAC-SLD) for the E-Rate Program. Bidders agree to comply with all requirements of the E-Rate Program for service providers. All bidders shall furnish their Service Provider Identification Number (SPIN) on their bid form. Minority business enterprises are encouraged to participate.Products/Services Open for BidsVendor may bid on a single or multiple items and services.• Wireless Access Point Requirements: 12 Wireless Access Points• Additional Wiring: Bring Ethernet wiring at FSMA location up to Delaware State Wiring Standards from current Cat 5, to include: 1. Installation of (29) Ethernet CAT-6 lines with in-wall concealment and terminal jacks. 2. Testing and certification of all Ethernet CAT-6 lines installed 3. Connection of each Ethernet line to client provided devices 4. Five additional hours of troubleshooting for existing lines if necessary• Caching Server with Uninterruptable Power Supply (UPS) 1. Dual Processors, 16GB RAM, four 2TB HD, RAID5, with UPS Consideration Criteria: • Short term, long term and maintenance costs. Initial purchase price will be the highest value criterion per USAC guidelines• Features and Ease of Use • Overall effectiveness of solution• Warranty, Support and ServiceProposal Submission Requirements:• All proposals must include the Vendor’s SPIN number.• All proposals must include the cost per school of the entire project, including hardware, installation, licensing, warranty and shipping. • List separately the support and service costs that are identified as E-Rate eligible Category 2 Basic Maintenance of Internal Connections. Contract term for eligible support services shall be for a minimum one-year term to begin July, 1 2016. However, FSMA will consider awarding the contract for multiple years up to a five-year term to end June 30, 2021, if multi-year pricing is favorable. Because USAC rules designate Basic Maintenance of Internal Connections as a recurring service, any multi-year service contract shall be invoiced and paid separately for each year of the contracted service.• All bids should be prepared by school building and include description, model number, SKU, and cost. Vendor shall identify any specific components or costs that are not eligible for E-Rate funding.• Attach to the Bid a complete description of the proposed equipment including performance specifications, proposed technological solutions, equipment, warranties, etc. List all equipment and software proposed to include model numbers, version numbers, etc. All equipment is subject to approval by FSMA.• The Service Provider Invoice (SPI) method of invoicing must be used. More information about the SPI method of invoicing can be found at http://www.usac.org/sl/service-providers/step05/default.aspx.• State of Delaware, industry best practices and/or equivalent should be followed on all proposals, bids and recommendations, and are documented here respectively:https://dti.delaware.gov/information/standards-policies.shtmlhttps://dti.delaware.gov/pdfs/pp/CablingAndWiringStandard.pdf

Buyer

Who is buying this, and what else they have published.

FAFirst State Montessori AcademyWILMINGTON, United States

Timeline

  1. Passed: Notice published5 Feb 2016, 14:16
  2. Passed: Bids due4 Mar 2016, 00:00
  3. Today26 Nov 2026