UCDOPP5545 Multi-Operator Framework Agreement for Minor Works up to €1,000,000 including Construction Works, Electrical Works and Mechanical Works at University College Dublin

Offers

17 offers from 16 companies. 16 winners won.

Winning offers

Price not published
Winning offer
€16m
Estimate
Price not published
Winning offer
€16m
Estimate
Price not published
Winning offer
€16m
Estimate
Price not published
Winning offer
€16m
Estimate

Summary

University College Dublin or any wholly owned subsidiaries thereof (the “Contracting Authority”) invites tenders (“Tenders”) to this Invitation to Tender (“ITT”) from economic operators (“Tenderers”) for the supply of the works as described in the published documents over three Lots: Lot 1: Construction Works up to €1,000,000 Lot 2: Electrical Works up to €1,000,000 Lot 3. Mechanical Works up to €1,000,000

CPV codes1 code
  • 45214300Construction work for college buildings · main

Buyer

Who is buying this, and what else they have published.

Lots

3 lots, from €3.5m to €8m. Every lot is scored the same way. You can bid on any of them separately.

1
Construction work for college buildings45214300
€8m
2
Construction work for college buildings45214300
€4.5m
3
Construction work for college buildings45214300
€3.5m

Scoring

Price 40% · other 60%2 criteria
60%
Quality
40%
Cost
price

Documents

9 files, 9.2 MB in all.

  • UCDOPP5545 Multi-Operator Framework Agreement for Minor Works up to €1,000,000 including Construction Works, Electrical Works and Mechanical Works at University College Dublin (notice).pdf

    PDF document

    2.3 MB
  • UCDOPP5545 Lot 2. Pricing Schedule v.02.xlsx

    Excel spreadsheet

    210.3 KB
  • Science Hub - Lighting Second Floor (1).pdf

    PDF document

    332.2 KB
  • 202659 UCD JHN - Tender - June 2026.xlsx

    Excel spreadsheet

    2.2 MB
  • c4t_8314722_1.xml

    XML document

    796 B
  • Science Hub - Lighting Ground Floor (1).pdf

    PDF document

    565.1 KB
  • Appendix_B2_Certificate_of_Satisfactory_Project_Execution.docx

    Word document

    27.6 KB
  • DR A D06A Proposed Detail Section 1 17 07 2026.pdf

    PDF document

    1.4 MB

Timeline

  1. Passed: Contract conclusion16 Oct 2026
  2. Passed: Notice published3 Nov 2026, 00:00
  3. Today29 Nov 2026