Get notified before competitors do
PACHET DIVERSE MATERIALE
Offers
1 offer from 1 company. Janmar Com S.R.L. won at RON 1.2k.
Winning offer
- RON 1.2k
- Winning offer
- on the estimate
- RON 1.2k
- Estimate
Summary
Descriere
denpr cantitate um puv_fact
TEU ALAMA 1/2`TO2Z FN-1961 1.000 BUC 12.8099
DOP ALAMA FE STANDARD 1/2" RAODYNE (20/20) 1.000 BUC 4.1322
DOP ALAMA 3/8 FN410/38 1.000 BUC 2.8926
NIPLU ALAMA 1/2 N03Z FN-1968 4.000 BUC 4.1322
ROB COLT CAP CER 1/2X3/4 AP004B 1.000 BUC 25.6198
NIPLU MUFA ALAMA 3/4X1/2 FI-FE 1.000 BUC 7.4380
RAMIFICATIE PP D50/40*87 GRADE (HTEA) 1.000 BUC 7.1901
PP REDUCTIE SCURTA 50/32 3.000 BUC 5.3719
REDUCTIE SCURTA PP 40-32 3.000 BUC 7.0248
RAMIFICATIE PP D40/40*87 GRADE (HTEA) 1.000 BUC 3.3058
COT PP D32*87.5 GRADE 2.000 BUC 1.6529
COT PP D40*87.5 GRADE 1.000 BUC 2.0661
RACORD BATERIE FLEXIBIL1/2 L60CM STUT LUNG 4.000 BUC 11.1570
SIFON FLEX. ALCA A770+A33 1 1/2 40/50 CU VENTIL 2.000 BUC 17.7686
RACORD FLEXIBIL 1/2-1/2 L100CM 1.000 BUC 13.6364
RACORD WC A97 2.000 BUC 25.6198
GARNITURA CAUCIUC 32-25 2.000 BUC 3.3058
NIPLU ALAMA REDUS 1/2X3/8 FE-FE RAODYNE(10/10) 4.000 BUC 3.7190
COT ALAMA FI-FE STANDARD 1/2" RAODYNE (10/10) 3.000 BUC 10.3306
PRELUNGITOR ALAMA 1/2"X50MM FI-FE 1.000 BUC 12.3967
GARNITURA CAUCIUC VERDE 3/4 (100BUC) 3.000 BUC 0.5785
FURTUN EVACUARE MASINA DE SPALAT L300 PV-300 FERRO 1.000 BUC 18.1818
BATERIE LAVOAR+VENTIL SB-01 SANOBI BOEMA 4.000 BUC 131.4050
SIFON FLEX.ALCA 1 1/4 32/40 CU VENTIL 4.000 BUC 13.6364
ROB COLTAR CAP CER 1/2-1/2 AP004B TECHMAN 8.000 BUC 22.3140
ROB COLTAR CAP CER 1/2X3/8 AP004B TECHMAN 2.000 BUC
- 44423000Miscellaneous articles · main
- 44192000Other miscellaneous construction materials
Buyer
Who is buying this, and what else they have published.
Items
1 item the buyer listed with this notice.
| Item | Quantity | Unit price |
|---|---|---|
| 1 bucata | RON 1,157.32 |
Documents
Documents have not been synced yet. Last checked 28 Nov 2026, 15:44.
Timeline
- Passed: Notice published20 Oct 2026, 10:00
- Passed: Data deciziei furnizorului20 Oct 2026
- Passed: Data deciziei autorității contractante20 Oct 2026
- Passed: Data finalizării procedurii20 Oct 2026
- Passed: Dată limită pentru decizia furnizorului22 Oct 2026
- Passed: Dată limită pentru decizia autorității contractante25 Oct 2026
- Today28 Nov 2026