Ground Investigation in relation to the Keston Ponds Project
Keep momentum on this opportunity
Save it on this device now. Create an account when you are ready to track deadlines, notes, and teamwork.
- Save and reuse search filters
- Track opportunities as pursuits
- Get notified when new notices match
Keep this notice in a shortlist so you can return to it without starting a bid.
Keep notes, monitor deadlines and collaborate with your team. This does not submit a bid or contact the buyer.
Key information
Overview
The objectives of the ground investigation are: • Characterisation of the embankment dam structures in terms of composition, stratigraphy, and internal condition; • Assessment of seepage pathways, groundwater regime, and hydraulic connectivity between ponds; • Provide geotechnical parameters for the design of foundations for replacement footbridge structures at locations confirmed by the Supervising Engineer. • Characterisation of soils within the proposed river restoration corridor and wetland creation areas; • To monitor the variation in existing groundwater levels within the floodplain prior to restoration works to establish a baseline; • Environmental and waste classification of arisings in support of the earthworks strategy.
Procurement Act 2023
Below threshold - limited competition