Framework Agreement for the Solar Park - Energielandschap Lageland
Keep momentum on this opportunity
Save it on this device now. Create an account when you are ready to track deadlines, notes, and teamwork.
- Save and reuse search filters
- Track opportunities as pursuits
- Get notified when new notices match
Keep this notice in a shortlist so you can return to it without starting a bid.
Keep notes, monitor deadlines and collaborate with your team. This does not submit a bid or contact the buyer.
Key information
Overview
The Client intends to enter into a Framework Agreement (the Agreement) with three (3) parties for the construction of the Solar Park. The Specific Contracts under the Agreement will be put out to tender as turnkey EPC contracts for the Solar Park, with the Tenderer who, in the ranking of this tender, has submitted the most economically advantageous tender being awarded the first Specific Contract. The EPC contractor must deliver the solar park on a turnkey basis, including the intake substation. The EPC contractor is responsible for the necessary coordination with the supplier of the intake substation and for ensuring the correct integration of both installations. Phase 1: approximately 58.9 MWp PV, connected to a 21 MW grid connection (shared with the BESS), with a target operational date of Q1 Phase 2: expansion by approximately 142.3 MWp of PV (total approximately 201 MWp; including third-party contributions, approximately 250.5 MWp), in conjunction with the upscaling of t 2029. - Phase 1: approximately 58.9 MWp PV, connected to a 21 MW grid connection (shared with the BESS), with a target operational date of Q1 2029. - Phase 2: expansion by approximately 142.3 MWp of PV (total approximately 201 MWp; including third-party contributions, approximately 250.5 MWp), in conjunction with the upscaling of the connection (feed-in capacity up to 260 MW, off-take up to 145 MW). Phase 2 is not being awarded at this stage, but is secured within the Agreement and will be called off at a later date via a mini-competition between the Framework Contractors. The indicative timetable is around 2032/2033, subject to TenneT. The site covers approximately 175 ha of wet peatland.
Lots1
Documentation12
- 209.5 KB
TN614636 - EF17 Aankondiging van een opdracht - sectorale richtlijn, standaardregeling 20260925120156.pdf
PDF document
- 3.0 MB
Annex 8A project information. VO lageland 1-5000 totaaltekening.pdf
PDF document
- 191.9 KB
Annex 8B project information. Fase 1 and 2 Energieladschap Lageland PV.pdf
PDF document
- 577.2 KB
Annex 1 UEA (ESPD) PV.pdf
PDF document
- 211.6 KB
Annex 2 - Code of Conduct for Suppliers v1.0.pdf
PDF document
- 31.7 KB
Annex 7 Data Security Declaration v1.0 PV.docx
Word document
- 32.8 KB
Annex 5 - Declaration of no Russian involvement v1.0 PV.docx
Word document
- 38.8 KB
Annex 3- Reference Statement PV.docx
Word document
- 32.7 KB
Annex 6 - Certificate of Guarantee v1.0 PV.docx
Word document
- 779.1 KB
Selection Guidelines for the Solar Park Framework Agreement 1.0.pdf
PDF document
- 43.7 KB
Annex 10 Statement of Selection Criteria PV.docx
Word document
- 28.6 KB
Annex 4 - Director's declaration of lawful tendering v1.0 PV.docx
Word document