25-180 Housing Adaption Grant 8 Sarto Park, Naas, Co. Kildare, W91 N2RH.

E4National Below Threshold Contract Award Notice (CAN)8d0ed751-f0c6-40af-82d8-12e5f9029cc1KCKildare County Council_385
Estimated value€9,095
Deadline—
Competition11 participant
Lots11 lot

Keep momentum on this opportunity

Save it on this device now. Create an account when you are ready to track deadlines, notes, and teamwork.

  • Save and reuse search filters
  • Track opportunities as pursuits
  • Get notified when new notices match
Quick actions

Keep this notice in a shortlist so you can return to it without starting a bid.

Keep notes, monitor deadlines and collaborate with your team. This does not submit a bid or contact the buyer.

Receive alerts

Key information

Contract type
—
Deadline
—
CPV codes
45000000 - Construction work
Status
Awarded
Notice type
E4National Below Threshold Contract Award Notice (CAN)
Source
Estimated value
€9,095
Publication date
24 Aug 2026, 15:39

Overview

Work includes: # Re-hinge bathroom door to open to the right as shown on drawing T-4201. # Removal of existing bathroom appliances WC, WHB and bath. # Removal off all the existing wall tiles to 4 walls of bathroom. (see images on sheet T-4200. # Removal of the existing floor tiles. # Tile the floor and the walls (floor to ceiling). # All pipe work to be recessed and sent to the external S.V.P. # Allow for tanking the whole bathroom to a height of 1.5m in the shower area and a height of 200mm in the rest of the bathroom. # Removal of all demolition debris from site and suitable disposal. # Install new Level Access Shower with grab rails and thermostatically controlled shower. # Install new WC and grab rails # Install new WHB. # Install new wall mounted Bariatric seat with legs and arms to shower. # Install new folding half height doors to shower. # Install new u-shaped shower curtain rail and weighted split shower curtain # Install Wall mounted electric heater. # Install a new wall mounted mirror with shaver charging point and light above the sink. # Install passive air vent to external wall and mechanical extractor fan to ceiling vented externally. # Radiator relocated beside sink (replace with new radiator). # Remove the door saddle and make good. # Repaint the existing bathroom ceiling with two coats of bathroom paint. # Paint all woodwork including door, doorframe, and architrave on both sides. # Full remedial works to the existing bathroom as necessitated by the works (e.g., reinstatement of floors, walls, and ceilings.). • Check all external drainage both Surface and Foul to ensure it is adequate and working. Construction new surface water and foul mains if necessary. • Removal of all demolition debris from site - which is to be suitably disposed of. All builders waste associated with demolition to be removed and disposed of in accordance with current legislation. • All new work to comply with current Building Regulations standard, KCC issued drawings and KCC standard specification. • Full remedial works to the existing dwelling necessitated by the works. (e.g., make good the walls, allow for re-painting as required.) to be included. • Tying in all services to existing and making good all finishes affected by work both externally and internally to be included. • Please note that the house will be occupied throughout the construction period.

Contracting authorities1

KC

IE-REGISTRATION-NUMBER 0013247i

ieNaas, Ireland
[email protected]

Lots1

Documentation1

1 document
  • 25-180 Housing Adaption Grant 8 Sarto Park, Naas, Co. Kildare, W91 N2RH. (notice).pdf

    PDF document

    1.9 MB

Award criteria0

No procedure-level award criteria recorded.

Participants1