Connection of Townawilly Group Water Scheme Co-Operative Society to the Public Water Supply
Keep momentum on this opportunity
Save it on this device now. Create an account when you are ready to track deadlines, notes, and teamwork.
- Save and reuse search filters
- Track opportunities as pursuits
- Get notified when new notices match
Keep this notice in a shortlist so you can return to it without starting a bid.
Keep notes, monitor deadlines and collaborate with your team. This does not submit a bid or contact the buyer.
Key information
Overview
This project involves upgrading and restructuring the water supply infrastructure in the Townawilly area. The aim is to improve water quality, ensure compliance with regulatory standards, and deliver a more efficient and reliable water network. The contract includes the design and construction of an interconnector water main to connect the existing scheme to the Public Water Supply Scheme (PWSS) operated by Uisce Éireann (UÉ), which will allow for the decommissioning of the Townawilly Group Water Scheme (GWS) Water Treatment Plant. The contract also involves key upgrades to UÉ infrastructure, including construction of new watermain connections and a new booster pump station (PS) at the Glencoagh Storage Reservoir (SR) site to serve both the Glencoagh and Eddrim Glebe networks. Additionally, the Eddrim Glebe PS will be upgraded with new pumps and a change in the pumping arrangement.
Lots1
Documentation11
- 2.0 MB
Connection of Townawilly Group Water Scheme Co-Operative Society to the Public Water Supply (notice).pdf
PDF document
- 43.3 KB
QW2-Appendix-A-Applicants-Self-Declaration-re-Regulation-57.docx
Word document
- 2.4 MB
Townawilly Appropriate Assessment Screening and Natura Impact Statement.pdf
PDF document
- 2.1 MB
Townawilly Archaeology and Built Heritage Screening.pdf
PDF document
- 30.8 KB
QW2-Appendix-B3-Certificate-of-Satisfactory-Delivery-of-Services.docx
Word document
- 31.6 KB
QW2-Appendix-B2-Certificate-of-Satisfactory-Project-Execution.docx
Word document
- 1.3 MB
Civil Engineering Works designed by the Contractor (PW-CF4-v2.7-01-05-2024).pdf
PDF document
- 1.3 MB
Townawilly GWS -Geophysical Survey Report.pdf
PDF document
- 533.4 KB
Form of Tender and Schedule.pdf
PDF document
- 11.1 MB
Townawilly GWS -Ground Investigation Report.pdf
PDF document
- 349.7 KB
QW2-3.4.2-HS-PSCS.pdf
PDF document