Call for Competition - Short Circuit Limiters
Track this opportunity
Register to add pursuits, save this notice, and get alerts when similar tenders appear.
- Save and reuse search filters
- Track opportunities as pursuits
- Get notified when new notices match
Key information
Overview
Short circuit limiters. The limiter will be located in the 150/25kV transformer substations within the Stedin Grid. The limiter will be in between rail sections as shown on the figure below. If three or more transformers are connected in parallel the total short circuit power exceeds the grid limits. In the case of a short circuit the limiter should limit the total fault current delivered tp the fault location to within tolerable limits.
02 Mar 2026, 16:31
Publication date
Publication
25 Mar 2026, 11:00
Submission deadline
Deadline
None recorded.