SSScoala Gimnaziala SantanaSantana, Romania

MATERIALE DE CONSTRUCTII

Offers

1 offer from 1 company. Alexandria Matcons S.R.L. won at RON 1.8k.

Winning offer

RON 1.8k
Winning offer
on the estimate
RON 1.8k
Estimate

Summary

Descriere

1.INCUIETOARE BIROU 1023 /L(MM) 25 642012 ; 7,02LEI/BUC , 1BUC 2.PROFIL AL TREAPTA 40/25 2,7M AU 3130 579144 NC8/CPV; 76042990 ; 48,76LEI/BUC ; 1BUC 3. PISTOL DE STROPIT 2 FUNCTII DUZA A;AMA 2012 682294 ; 24,79LEI/BUC ; 1BUC 4. CONECTOR ADAPTOR FURTUN FI 2012 D(INCH) 3/4-1 682282 ; 3,31LEI/BUC ; 2BUC 5.COLIER INOX PENTRU FURTUN /D(MM) 16-32 ,A(BUC)10 675731 NC8/CPV;73262000 , 1,24LEI/BUC, 4BUC 6.ROBINET COLTAR ALAMA 1/2-3/8 CU CAP ARMATURA CERAMIC D(INCH) 1/2-3/8 680988 NC8/CPV;84818011 ; 11,57LEI/BUC ; 2BUC 7.BATERIE LAVOAR+VENTIL Q-01 SANQ (1/12)49596 NC8/CPV;84818011 ; 90,91LEI/BUC ; 1BUC 8. RACORD WC FLEXIBIL Q110MM, FLEXIBIL EXTENSIBIL 230-530MM ; 20,66LEI/BUC ; 1BUC 9. FURTUN TRANSPARENT 3/4 50ML NETED H10026 D(INCH)3/4 ,L(M)50 ; 4,13LEI/ML ; 100ML 10.SIFON FLEXIBIL EXT.G207 LAV.11/4 IESIRE 32/40MM ANIPLAST G207VEU NC8/CPV;39174000 ; 14,05 , 2BUC 11.LACAT ALBASTRU 38MM 252140 ;9,92LEI/BUC ; 2BUC 12. GRIFFON STEX GRANULE DESFUNDAT COND.600G 200124 NC8/CPV;34029090 ; 35,54LEI/BUC ; 1BUC 13.MANUSA LATEX CU POLIESTER ELASTICA-10 L211610K NC8/CPV;61161020 ; 9,92LEI/BUC ; 5BUC 14, DISC DEBITARE MLW 230X1 (DISC 230X1,9) ; 10,74LEI/BUC , 8BUC 15.CADA APOLLO 96L DREPT PY ADIDAC ; 47,11LEI/BUC ; 1BUC 16. CHEI IMBUS / S(MM) 3-19 ,N(BUC/SET)10 610003 ; 35,54LEI/BUC ; 1BUC 17.PRELUNGITOR ALAMA 1/2X50MM 18119 NC8/CPV;74122000 ; 9,09LEI/BUC ; 2BUC 18. PRELUNGITOR ALAMA 1/2X40MM AL 18117 NC8/CPV;74122000 , 7,85LEI/BUC , 2BUC 19.ROBINET DUBLU SERVICI FONTA 3/4-1 SFERIC 10605 NC8/CPV;848

CPV codes1 code
  • 44192000Other miscellaneous construction materials · main

Buyer

Who is buying this, and what else they have published.

SSScoala Gimnaziala SantanaSantana, Romania

Items

1 item the buyer listed with this notice.

ItemQuantityUnit price
1 PACHETRON 1,799.38

Documents

Documents have not been synced yet. Last checked 22 Nov 2026, 09:30.

Timeline

  1. Passed: Notice published18 Sept 2026, 09:46
  2. Passed: Data deciziei furnizorului18 Sept 2026
  3. Passed: Data deciziei autorității contractante18 Sept 2026
  4. Passed: Data finalizării procedurii18 Sept 2026
  5. Passed: Dată limită pentru decizia furnizorului22 Sept 2026
  6. Passed: Dată limită pentru decizia autorității contractante23 Sept 2026
  7. Today22 Nov 2026