Get notified before competitors do
MATERIALE CONSTRUCTII- CONSUMABILE
Offers
1 offer from 1 company. Petrus Prod S.R.L. won at RON 2.7k.
Winning offer
- RON 2.7k
- Winning offer
- on the estimate
- RON 2.7k
- Estimate
Summary
Descriere
1 FOARFECA GARD VIU CU MANER ALUMINIU SI REGLAJ 190MM 40058 Buc 1.00 76.03 76.03 15.97 2 CARTE LIPICI Buc 17.00 4.13 70.21 14.74 3 LACAT GALBEN 63MM 8106 Buc 1.00 9.92 9.92 2.08 4 CAPAC PATRAT DIN PLASTIC BAZA 60X60MM Buc 15.00 2.07 31.05 6.52 5 THERMO UNIVERSAL 25KG SAC 1.00 33.88 33.88 7.12 6 EMAIL IDEEA NEGRU 0.75L Buc 1.00 24.79 24.79 5.21 7 DILUANT UNIV D509 0.5L K Buc 1.00 4.96 4.96 1.04 8 DISC ABRAZIV 125X1X22.2. Buc 4.00 5.79 23.14 4.86 9 SURUB AUTOFORANT 4.8X35 RAL3005 Buc 500.00 0.17 82.65 17.36 10 PANZA BOMFAIER LEMN-METAL 20X300MM Buc 1.00 0.83 0.83 0.17 11 SURUB GIPS CARTON 3.5X55 100/PUNGA Buc 3.00 9.92 29.76 6.24 12 SURUB GIPS CARTON 4.2X70 100/PUNGA Pungi 1.00 13.22 13.22 2.78 13 CAPAC ROTUND DIN PLASTIC FI 60MM Buc 40.00 1.65 66.00 13.86 14 PENSULA CP 2.5 Buc 1.00 4.96 4.96 1.04 15 FOLIE PE TRATATA UV LATIME 4-6ML Kg 3.80 16.53 62.81 13.19 16 SURUB CAP IMBUS M8X40 Buc 2.00 0.83 1.66 0.35 17 MUFA COMPRES.D.20 Buc 1.00 4.96 4.96 1.04 18 DIBLU CU SURUB SM 8X80 100/CUT Buc 10.00 0.41 4.10 0.86 19 SAIBA DIN 9021 M10 Buc 10.00 0.41 4.10 0.86 20 SURUB PT LEMN 4.5X35MM CAP INECAT Buc 50.00 0.08 4.00 0.84 21 APLICA HL-A1 ROTUND 23W 18CM Buc 1.00 37.19 37.19 7.81 22 SET 8 BATERII ZINC-CARBON AAA SET 3.00 9.92 29.76 6.25 23 VENTIL CU DOP+SIFON FLEXIBIL PT CHIUVETA D.40 Buc 1.00 7.44 7.44 1.56 24 CM11 PLUS ADEZIV CERESIT EXT/INT 25 KG SAC 1.00 41.32 41.32 8.68 25 BATERII VARTA ALCALIN LONGLIFE AA 2/SET SET 2.00 9.92 19.84 4.17 26 RACORD FLEX.MONOC.TES.INOX 60CM Buc 1.00
- 44192000Other miscellaneous construction materials · main
Buyer
Who is buying this, and what else they have published.
Items
1 item the buyer listed with this notice.
| Item | Quantity | Unit price |
|---|---|---|
| 1 bucată | RON 2,658.18 |
Documents
Documents have not been synced yet. Last checked 25 Nov 2026, 04:41.
Timeline
- Passed: Notice published2 Oct 2026, 15:00
- Passed: Data deciziei furnizorului2 Oct 2026
- Passed: Data finalizării procedurii2 Oct 2026
- Passed: Data deciziei autorității contractante2 Oct 2026
- Passed: Dată limită pentru decizia furnizorului6 Oct 2026
- Passed: Dată limită pentru decizia autorității contractante7 Oct 2026
- Today25 Nov 2026