Manchester International Airport - Shotcrete works

opportunityOpportunityContracts finder64a43aa2-d0e2-4988-9792-bdb6052db610KNKier Transportation - CP7 NWC
103 days left
Estimated value£250,000 – £500,000
Deadline103 days left10 Feb 2027, 00:00
Competition00 participants
Lots00 lots
Quick actions

Keep this notice in a shortlist so you can return to it without starting a bid.

Keep notes, monitor deadlines and collaborate with your team. This does not submit a bid or contact the buyer.

Receive alerts

Key information

Contract type
—
Deadline
10 Feb 2027, 00:00
CPV codes
44114100 - Ready-mixed concrete44114210 - Concrete piles45234000 - Construction work for railways and cable transport systems45262310 - Reinforced-concrete work
Status
Closed
Notice type
opportunityOpportunity
Estimated value
£250,000 – £500,000
Publication date
6 Oct 2026, 08:00

Overview

The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable.Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. The scope areas for this package are as follows: -Preparation and cleaning of exposed contiguous piled retaining wall faces. -Supply and installation of mesh reinforcement, anchor bars and injection mortar. -Supply, delivery, application, curing and finishing of sprayed concrete (shotcrete). -Formation and sealing of expansion and construction joints. -Protection of adjacent assets from rebound, overspray and damage. -Testing, inspection, quality assurance and handover documentation. -Removal and disposal of rebound material, washout and associated waste. -Working within a live rail and airport environment in accordance with all project and Network Rail requirements.

C4N120562379

Suitable for SMEs: yes; Suitable for VCSEs: no

from 2027-02-10 to 2027-07-27

North West, United Kingdom British Oversea Territories Channel Islands Europe Isle of Man Rest of the World United Kingdom

Tender notice: Please follow this link to view the notice. (https://www.competefor.co.uk/business/viewOpportunityDetailsSupplier.html?id=120562388)

Contracting authorities1

KN

Lots0

No lots recorded for this notice.

Documentation0

The source system does not support document syncing.

Award criteria0

No procedure-level award criteria recorded.

Participants0

No participants recorded for this notice.