Killanny Reaghstown Group Water Scheme - Network Upgrade
Keep momentum on this opportunity
Save it on this device now. Create an account when you are ready to track deadlines, notes, and teamwork.
- Save and reuse search filters
- Track opportunities as pursuits
- Get notified when new notices match
Keep this notice in a shortlist so you can return to it without starting a bid.
Keep notes, monitor deadlines and collaborate with your team. This does not submit a bid or contact the buyer.
Key information
Overview
Construction of approximately 3150 m of 110 mm O.D. PE100 SDR11 distribution main, constructed in the L5151 and adjacent laneways, 2490m by trenchless technique method such as Horizontal Directional Drilling and 660m constructed by open dig method. Construction of approximately 2950m of 110 mm O.D. PE100 SDR11 distribution main, constructed in the L8810/L4921 and adjacent laneways, 2050m constructed by trenchless technique method such as Horizontal Directional Drilling and 900m constructed by open dig method. Construction of new consumer service connections onto the new main and connect to existing meter boxes,, along with associated valves and fittings, temporary and permanent reinstatement and all other ancillary works
Lots1
Documentation10
- 2.0 MB
Killanny Reaghstown Group Water Scheme - Network Upgrade (notice).pdf
PDF document
- 455.5 KB
- 309.3 KB
26010-TJOC-XX-XX-TD-C-7026_ITT.pdf
PDF document
- 108.2 KB
26010-TJOC-XX-XX-TD-C-7022_Vol_B.pdf
PDF document
- 3.1 MB
26010-TJOC-XX-XX-TD-C-7020_Vol_A1_Drgs.pdf
PDF document
- 1.0 MB
26010-TJOC-XX-XX-TD-C-7021_Vol_A2_Spec.pdf
PDF document
- 774.4 KB
26010-TJOC-XX-XX-TD-C-7024_Vol_D_CoC.pdf
PDF document
- 235.3 KB
26010-TJOC-XX-XX-TD-C-7023_Vol_C.pdf
PDF document
- 20.8 MB
26010-TJOC-XX-XX-TD-C-7025_Vol_E.pdf
PDF document
- c4t_8622804_1.xml803 B
XML document