Installation of New Biomass Heating System at Aura Leisure Centre, Letterkenny
Track this opportunity
Register to add pursuits, save this notice, and get alerts when similar tenders appear.
- Save and reuse search filters
- Track opportunities as pursuits
- Get notified when new notices match
Key information
Overview
Installation of 500kW Biomass Boiler at Aura Leisure Centre including associated mechanical and electrical works to operate and connect to existing heating system and construction of a flue pipe. Storage, loading and thermal storage systems to be installed as part of the works. DCC are novating the design responsibility of the Contract to the main contractor who can propose either an alteration and refurbishment of the existing Biomass system which has been out of use since 2014 due to a basement system which was flooded or a new stand alone system. Alterations to the existing boiler house for the main building is also to be included in the scope of works and this is outlined in the technical specification including a new pressurisation system to be installed.
15 Jul 2026, 23:00
Notice dispatch/publication date
Publication
11 Aug 2026, 11:00
Deadline for requesting additional information
Deadline
17 Aug 2026, 11:00
Deadline for receipt of tenders
Deadline
None recorded.
Lots1
Documentation9
- 1.9 MB
Installation of New Biomass Heating System at Aura Leisure Centre, Letterkenny (notice).pdf
PDF document
- Pricing Schedule.doc169.5 KB
Word document
- Health and Safety Forms.zip499.2 KB
Archive
- 96.1 KB
FTS5_v2.10-16-06-2026.docx
Word document
- 1009.6 KB
- SAQ ITT and Appendices.zip455.1 KB
Archive
- 2.0 MB
- Technical Docs.zip7.2 MB
Archive
- c4t_8636590_1.xml796 B
XML document