Track this opportunity
Register to add pursuits, save this notice, and get alerts when similar tenders appear.
Design, manufacturing, delivery, installation and commissioning of a cryogenic supply system to supply liquid hydrogen from a tank to up to four (4) test positions. • Pipeline Types: o Cryogenic Pipeline: Vacuum-insulated, DN40 PN16, approx. 110m in length o Cryogenic Transfer Pipeline (optional): Vacuum-insulated, DN25 PN16, approx. 120m in length o Cryogenic Exhaust Pipeline to Flare: Non-insulated, DN250 PN16, approx. 110m in length o Cryogenic Distribution Panel: Vacuum-insulated, primarily DN40 PN16, central distribution panel with purge functions and flow measurement o 3 (+1 optional) Panels at the Test Position: Vacuum-insulated, primarily DN40 PN16, compact panel with purge function and shut-off at the test site o Purge Lines for Helium and Nitrogen: Extending up to the panel boundary • Scope of Work (incl. but not limited to): o Detailed, execution, and installation planning (P&IDs are available) o Pipeline design & stress analysis, including support system design o Panel design o Procurement of all components o On-site installation o Coordination with other project lots • Services Provided by the Client: o Foundations o Control system and control pressure supply o Main pipe routes, including posts and pipe bridges for routing (excluding pipeline hangers)
Ausschlussgründe wegen der Nähe zu Russland: Der Katalog der Ausschlussgründe ergibt sich aus Artikel 5 k) Absatz 1 der Verordnung (EU) Nr. 833/2014 in der Fassung des Art. 1 Ziff. 23 der Verordnung (EU) 2022/576 des Rates vom 8. April 2022.
Track this opportunity
Register to add pursuits, save this notice, and get alerts when similar tenders appear.
Design, manufacturing, delivery, installation and commissioning of a cryogenic supply system to supply liquid hydrogen from a tank to up to four (4) test positions. • Pipeline Types: o Cryogenic Pipeline: Vacuum-insulated, DN40 PN16, approx. 110m in length o Cryogenic Transfer Pipeline (optional): Vacuum-insulated, DN25 PN16, approx. 120m in length o Cryogenic Exhaust Pipeline to Flare: Non-insulated, DN250 PN16, approx. 110m in length o Cryogenic Distribution Panel: Vacuum-insulated, primarily DN40 PN16, central distribution panel with purge functions and flow measurement o 3 (+1 optional) Panels at the Test Position: Vacuum-insulated, primarily DN40 PN16, compact panel with purge function and shut-off at the test site o Purge Lines for Helium and Nitrogen: Extending up to the panel boundary • Scope of Work (incl. but not limited to): o Detailed, execution, and installation planning (P&IDs are available) o Pipeline design & stress analysis, including support system design o Panel design o Procurement of all components o On-site installation o Coordination with other project lots • Services Provided by the Client: o Foundations o Control system and control pressure supply o Main pipe routes, including posts and pipe bridges for routing (excluding pipeline hangers)
Ausschlussgründe wegen der Nähe zu Russland: Der Katalog der Ausschlussgründe ergibt sich aus Artikel 5 k) Absatz 1 der Verordnung (EU) Nr. 833/2014 in der Fassung des Art. 1 Ziff. 23 der Verordnung (EU) 2022/576 des Rates vom 8. April 2022.
31 Jan 2000, 23:00
Award decision
Award decision
03 Jun 2026, 14:06
Dispatch date
Milestone
04 Jun 2026, 22:00
Publication date
Publication
07 Jul 2027, 22:00
Contract end date
Deadline
None recorded.
31 Jan 2000, 23:00
Award decision
Award decision
03 Jun 2026, 14:06
Dispatch date
Milestone
04 Jun 2026, 22:00
Publication date
Publication
07 Jul 2027, 22:00
Contract end date
Deadline
None recorded.