Heat Pump Supply, Installation and Commissioning IWA Clontarf
Keep momentum on this opportunity
Save it on this device now. Create an account when you are ready to track deadlines, notes, and teamwork.
- Save and reuse search filters
- Track opportunities as pursuits
- Get notified when new notices match
Keep this notice in a shortlist so you can return to it without starting a bid.
Keep notes, monitor deadlines and collaborate with your team. This does not submit a bid or contact the buyer.
Key information
Overview
• Remove existing heating services and plant as indicated on the contract drawings. • Install new plant, pipework and ancillaries as per the contract drawings including: o New Heat pumps o Pipework and headers o Pumps o Pressurization unit o Buffer Vessel o Valves, motorized valves and ancillaries o Water pressurization set • Supply and install new LPHW distribution pipework as per contract drawings. • Supply and install any controls associated with the heat pumps, pressurization unit, etc. • Supply and install radiators and radiator control valves as specified throughout • Test and commission and certify the new system • Supply and install new heating control panels and field devices and test and commission system The contractor shall liaise with the client to agree time schedules for heating system and set point temperatures for the system temperature stats. The contractor shall include for a full demonstration of the system to the consultant and the client.
Lots1
Documentation3
- 2.0 MB
Heat Pump Supply, Installation and Commissioning IWA Clontarf (notice).pdf
PDF document
- 5.5 MB
- c4t_8893404_1.xml794 B
XML document