Feasibility Study for Hazardous Waste Treatment and Disposal Facilities

Request for Expression of InterestRequest for expressions of interestop00475482SLSolid Waste Management Company of Georgia LTD
2 days left
Estimated valueUS$236,000
Deadline2 days left29 Oct 2026, 14:00
Competition00 participants
Lots00 lots
Quick actions

Keep this notice in a shortlist so you can return to it without starting a bid.

Keep notes, monitor deadlines and collaborate with your team. This does not submit a bid or contact the buyer.

Receive alerts

Key information

Identifier
Contract type
—
Deadline
29 Oct 2026, 14:00
CPV codes
—
Status
Open
Notice type
Request for Expression of InterestRequest for expressions of interest
Estimated value
US$236,000
Publication date
15 Oct 2026, 00:00

Overview

P518850 – Georgia Water Supply, Sanitation, Wastewater, and Hazardous Waste GFPP (Georgia, Europe And Central Asia)

GFPP/CS/CQS-01

Consultant Qualification Selection (CQS); market approach: Open, International

80101601 Feasibility studies or screening of project ideas

English

REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – FIRMS SELECTION) Georgia Preparation Grant for Georgia Water Supply, Sanitation, Wastewater, and Hazardous Waste Project Grant Number: P518850 Assignment Title: Feasibility Study for Hazardous Waste Treatment and Disposal Facilities. Reference No.: GFPP /CS/CQS-01 The Government of Georgia has received financing from the World Bank toward the cost of the Preparation Grant for Georgia Water Supply, Sanitation, Wastewater, and Hazardous Waste Project and intends to apply part of the proceeds for consulting services. The Consulting Services encompass the preparation of a detailed feasibility study for a sustainable, nationally scaled hazardous waste management system in Georgia. Building upon the 2024 EBRD Updated Feasibility Study and recent data from the SWMCG, the study will deepen the existing analysis by specifically focusing on Data Validation- Verifying waste characterization, confirming environmental protection measures and optimizing HW collection and transportation logistics. Re-assessing the proposed site regarding access infrastructure needs and developing a phased construction schedule. HW treatment technology selection, technical parameters, financial sustainability, and capacity phasing consistent with projected waste streams through 2040. The detailed Terms of Reference (TOR) for the assignment can be found at the following link: https://www.dropbox.com/scl/fo/13n7cpfd1kgcfkzsmrt2y/AMd-TjPAr1PM2kNtuEb1CeA?rlkey=itv0xhsdvxtpdvadi9p5lj3z2&st=ogxzyc1o&dl=0 The Solid Waste Management Company of Georgia (SWMCG) (operating under Ministry of Environmental Protection and Agriculture) now invites eligible consulting firms (“Consultants”) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. The shortlisting criteria are: No Criterion Mandatory minimum requirement Supporting evidence 1 Legal status The company must be legally registered and allowed to provide consulting services. It must not be banned from this procurement or have business or personal interests that could compromise fair selection or independent advice. For joint ventures, each member must meet these requirements. Company registration document and a signed declaration confirming compliance with the above requirements. For a joint venture, provide: the registration document and signed declaration for each JV member; and a copy of the signed Joint Venture Agreement, or, if the JV has not yet been formally constituted, a signed Letter of Intent/Commitment from all proposed JV members confirming their agreement to form the joint venture for this assignment and identifying the lead member. 2 Financial and legal status No bankruptcy, insolvency or liquidation proceedings preventing contract performance. No pending litigation, enforcement proceedings, asset attachment or freezing order materially impairing the applicant's ability to perform the assignment. For a joint venture, each member must meet this requirement. Signed declaration and supporting official documents where applicable. 3 Annual turnover Average annual consulting-services turnover of at least USD 600,000, or equivalent, over the last three completed financial years. Joint venture members' turnover may be combined. Audited financial statements, or certified financial statements where auditing is not legally required. 4 Waste management consulting experience At least Eight years of experience providing consulting services in waste management, including hazardous waste management. For joint ventures, relevant experience may be demonstrated collectively; at least one member must demonstrate the five-year experience requirement. Company profile and brief summaries of relevant waste management assignments. 5 Feasibility and technical assessment experience At least 4 (four) completed assignments preparing or updating feasibility studies or carrying out technical due diligence for waste treatment, disposal or storage facilities, including at least 2 (two) feasibility study. Assignments must have been completed between 1 January 2016 and the EOI submission deadline. At least one must include hazardous waste treatment, disposal or storage, either as a standalone facility or as part of a broader waste management project. Joint venture members may demonstrate this experience collectively. Brief project summaries stating the client, country, completion date, scope, services delivered and hazardous waste component. A single assignment may demonstrate both technical and environmental experience. 6 Comparable assignment value At least one completed relevant technical or combined technical and environmental consultancy assignment valued at USD 300,000 or more, or equivalent. Brief project summary confirming that the value threshold is met. Contract extracts and commercially sensitive details are not required. 7 Environmental assessment experience At least two completed environmental due diligence, environmental audit or environmental impact assessment assignments within the last ten years for infrastructure, environmental infrastructure or waste management projects. Brief project summaries stating the client, country, completion date, assessment scope and services delivered. 8 Organisational and managerial capacity Demonstrated arrangements for multidisciplinary assignment management, quality assurance, technical review and coordination of site investigations. Company organisational chart and description of management and quality assurance arrangements. Key Experts will not be evaluated at the shortlisting stage. Solid Waste Management Company of Georgia reserves it's right to verify submitted references and use obtained information for evaluation purposes. The attention of interested Consultants is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World Bank’s “Procurement Regulations for IPF Borrowers” September 2025, seventh edition (“Procurement Regulations”), setting forth the World Bank’s policy on conflict of interest. In addition, please refer to the following specific information on conflict of interest related to this assignment: The consultant shall not receive any payment in connection with the assignment except as provided in the contract. The consultant and its affiliates shall not engage in consulting or other activities that conflict with the interest of the Client under the contract. Consultants may associate with other firms to enhance their qualifications, but should indicate clearly whether the association is in the form of a joint venture and/or a sub-consultancy. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected. Consultant will be selected in accordance with the Selection Based on Consultant’s Qualification (CQS) method set out in the Procurement Regulation. Further information can be obtained at the address: [email protected] ; cc: [email protected] Expressions of Interest accompanied by relevant information mentioned above must be submitted either as a hard copy or electronically to the address below not later than October 29, 2026, 18:00 local time. The electronic copy of Expressions of Interest shall be also attached to the hard copy (with USB/CD/DVD, etc). The Solid Waste Management Company of Georgia (SWMCG) (operating under Ministry of Environmental Protection and Agriculture) Attn: Mr. Mikheil Gogolidze, Director Address: 14 Ana Politkovskaia Street, 0159 Tbilisi, Georgia Tel: (995 03) 2 243 88 30 Email: [email protected] Web-Site: www.waste.gov.ge

Contracting authorities1

Lots0

No lots recorded for this notice.

Documentation0

The source system does not support document syncing.

Award criteria0

No procedure-level award criteria recorded.

Participants0

No participants recorded for this notice.