Engineering Consultancy Services Marine Civil Engineering Consultant for Preliminary, Design and Contract Documents (Stages 1, 2 and 3) for a Pontoon
Keep momentum on this opportunity
Save it on this device now. Create an account when you are ready to track deadlines, notes, and teamwork.
- Save and reuse search filters
- Track opportunities as pursuits
- Get notified when new notices match
Keep this notice in a shortlist so you can return to it without starting a bid.
Keep notes, monitor deadlines and collaborate with your team. This does not submit a bid or contact the buyer.
Key information
Overview
A Marine consultant is required for Preliminary (Feasibility), Design and Contract Documents (Stages 1, 2 and 3) for a pontoon structure alongside the Abbey Pier on Sherkin Island. Concept and planning designs need to be developed followed by the submission of a Marine Area Consent (MAC) and Part 8 planning application.
Lots1
Documentation3
- 2.0 MB
Engineering Consultancy Services Marine Civil Engineering Consultant for Preliminary, Design and Contract Documents (Stages 1, 2 and 3) for a Pontoon (notice).pdf
PDF document
- c4t_8975695_1.xml797 B
XML document