Engineer/Supervision of the Design and Build Works Contracts for Section 3 – Paraćin–Trupale–Medjurovo within the framework of the Belgrade–Niš Railway Modernization Project

cn-standardContract or concession notice – standard regime00649287-2026SJSerbian Railway Infrastructure JSC
17 days left
Estimated value—
Deadline17 days left15 Oct 2026, 10:00
Competition00 participants
Lots11 lot

Keep momentum on this opportunity

Save it on this device now. Create an account when you are ready to track deadlines, notes, and teamwork.

  • Save and reuse search filters
  • Track opportunities as pursuits
  • Get notified when new notices match
Quick actions

Keep this notice in a shortlist so you can return to it without starting a bid.

Keep notes, monitor deadlines and collaborate with your team. This does not submit a bid or contact the buyer.

Receive alerts

Key information

Identifier
Contract type
—
Deadline
15 Oct 2026, 10:00
CPV codes
71000000 - Architectural, construction, engineering and inspection services
Status
Active
Notice type
cn-standardContract or concession notice – standard regime
Source
Estimated value
—
Publication date
20 Sept 2026, 22:00

Overview

The Belgrade–Niš Railway Modernization Project encompasses the comprehensive modernization, reconstruction, and upgrading of the railway line connecting Belgrade and Niš, as part of Main Railway Line: Belgrade Center – Rasputnica “G” – Rakovica – Mladenovac – Lapovo – Niš – Preševo – state border – (Tabanovce). The subject of this Contract is the provision of Engineer/Supervision services for the design for the building permit, the design for construction, the as-built design and the Works under the Works Contracts for Section 3. The Works for Section 3 are implemented through two Design and Build Works Contracts: the first covering Subsections 3.1(Paracin-Stalac) 3.3 (Djunis-Trupale) and 3.4. (Trupale-Medjurovo) and the second covering Subsection 3.2. (Stalac-Djunis) The Works Contract for Subsection 3.2 has been signed as Lot 2; following the termination of the Lot 1 Works Contract, the remaining Lot 1 works are planned to be incorporated into the Lot 2 Works Contract through an amendment. The installation of ERTMS is planned under a third Works Contract; ERTMS is excluded from the scope of this Contract and will be subject to a separate procurement procedure for supervision services. The temporary signaling and telecommunication system required during the execution of the works is included in the Works Contracts and within the scope of this Contract.

Clause 5.1.9 should be interpreted as the minimum acceptable number of shortlisted tenderers should be between 4-6.

Contracting authorities1

Lots1

Documentation0

The source system does not support document syncing.

Award criteria0

No procedure-level award criteria recorded.

Participants0

No participants recorded for this notice.