Dublin City Council Single Party Framework Agreement for an Integrated Design Team for the Clontarf Flood Defence and Public Realm Project

EF29Contract award notice – general directive, standard regime9e6f8900-ecd0-4cb4-afd9-01cad722ceafDCDublin City Council
Estimated value€7,500,000
Deadline—
Competition00 participants
Lots11 lot

Keep momentum on this opportunity

Save it on this device now. Create an account when you are ready to track deadlines, notes, and teamwork.

  • Save and reuse search filters
  • Track opportunities as pursuits
  • Get notified when new notices match
Quick actions

Keep this notice in a shortlist so you can return to it without starting a bid.

Keep notes, monitor deadlines and collaborate with your team. This does not submit a bid or contact the buyer.

Receive alerts

Key information

Contract type
—
Deadline
—
CPV codes
71311000 - Civil engineering consultancy services71000000 - Architectural, construction, engineering and inspection services71240000 - Architectural, engineering and planning services71250000 - Architectural, engineering and surveying services71300000 - Engineering services
Status
Awarded
Notice type
EF29Contract award notice – general directive, standard regime
Source
Estimated value
€7,500,000
Publication date
7 Oct 2026, 23:00

Overview

The Contracting Authority, Dublin City Council, intends to establish a Single Party Framework Agreement with a Integrated Design Team to deliver planning, engineering, environmental, stakeholder engagement and other specialist consultancy services for the Clontarf Flood Defence and Public Realm Project (CFDPRP). The Project is located along the Clontarf waterfront in Dublin and encompasses a highly sensitive coastal environment adjoining designated European sites, including Special Areas of Conservation (SAC) and Special Protection Areas (SPA). The Project has been initiated to address existing and future coastal and surface water flood risks while delivering a coordinated programme of public realm enhancement, active travel improvements and environmental benefits. The scheme shall be developed through an integrated design approach that balances flood resilience, climate adaptation, biodiversity, heritage, placemaking, sustainable mobility, environmental protection and stakeholder aspirations. The initial call-off contract under the Framework will require the successful Applicant to undertake all services necessary to develop the Project from commencement through option identification, scheme development, environmental assessment, statutory consent processes and detailed design. This shall include the preparation of all technical studies, surveys, modelling, assessments, reports, designs and application documentation required to secure the necessary approvals and to progress the Project to a stage suitable for procurement and construction. The Framework Agreement may subsequently be utilised by the Contracting Authority to procure additional related services, including procurement support, construction-stage services, post-consent services and other specialist consultancy services associated with the delivery of the Project. The successful Applicant shall be required to develop a fully integrated and coordinated scheme that delivers flood protection, surface water management, active travel and public realm objectives within a single coherent design solution that is environmentally sensitive, climate resilient and appropriate to the strategic importance of the Clontarf waterfront. For further information please refer to documentation available to download from www.etenders.gov.ie Resource ID 8969388 – Input when notice created . Please note that this project is subject to funding.

The Contracting Authority, Dublin City Council, intends to establish a Single Party Framework Agreement with a Integrated Design Team to deliver planning, engineering, environmental, stakeholder engagement and other specialist consultancy services for the Clontarf Flood Defence and Public Realm Project (CFDPRP). The Project is located along the Clontarf waterfront in Dublin and encompasses a highly sensitive coastal environment adjoining designated European sites, including Special Areas of Conservation (SAC) and Special Protection Areas (SPA). The Project has been initiated to address existing and future coastal and surface water flood risks while delivering a coordinated programme of public realm enhancement, active travel improvements and environmental benefits. The scheme shall be developed through an integrated design approach that balances flood resilience, climate adaptation, biodiversity, heritage, placemaking, sustainable mobility, environmental protection and stakeholder aspirations. The initial call-off contract under the Framework will require the successful Applicant to undertake all services necessary to develop the Project from commencement through option identification, scheme development, environmental assessment, statutory consent processes and detailed design. This shall include the preparation of all technical studies, surveys, modelling, assessments, reports, designs and application documentation required to secure the necessary approvals and to progress the Project to a stage suitable for procurement and construction. The Framework Agreement may subsequently be utilised by the Contracting Authority to procure additional related services, including procurement support, construction-stage services, post-consent services and other specialist consultancy services associated with the delivery of the Project. The successful Applicant shall be required to develop a fully integrated and coordinated scheme that delivers flood protection, surface water management, active travel and public realm objectives within a single coherent design solution that is environmentally sensitive, climate resilient and appropriate

Contracting authorities1

DC

IE-REGISTRATION-NUMBER IE47732154U

ieDublin, Ireland
[email protected]

Lots1

Documentation1

1 document
  • Dublin City Council Single Party Framework Agreement for an Integrated Design Team for the Clontarf Flood Defence and Public Realm Project (notice).pdf

    PDF document

    2.0 MB

Award criteria1

Criterion information

Name
Quality
Weight
0% (0 of 100)
Order number
#0
Price criterion
No
Directly proportional
Yes
Description
Wrong procedure published. Please be advised that CFT-8969388 has been cancelled due to the incorrect procedure being used at the time of publication. A new CFT-9181107 has been published under the Restricted Procedure. Description of the method to be used if weighting cannot be expressed by criteria: Wrong procedure published. Please be advised that CFT-8969388 has been cancelled due to the incorrect procedure being used at the time of publication. A new CFT-9181107 has been published under the Restricted Procedure.

Participants0

No participants recorded for this notice.