Dublin City Council Contract for Architect Led Integrated Design Team for the Installation of a Pontoon at Islandbridge

EF16Contract notice – general directive, standard regimef0c03f77-8beb-4a58-a5fa-6ab6bb46764dDCDublin City Council
16 days left
Estimated value€1,300,000
Deadline16 days left15 Oct 2026, 11:00
Competition00 participants
Lots11 lot

Keep momentum on this opportunity

Save it on this device now. Create an account when you are ready to track deadlines, notes, and teamwork.

  • Save and reuse search filters
  • Track opportunities as pursuits
  • Get notified when new notices match
Quick actions

Keep this notice in a shortlist so you can return to it without starting a bid.

Keep notes, monitor deadlines and collaborate with your team. This does not submit a bid or contact the buyer.

Receive alerts

Key information

Contract type
—
Deadline
15 Oct 2026, 11:00
CPV codes
92000000 - Recreational, cultural and sporting services45000000 - Construction work
Status
Active
Notice type
EF16Contract notice – general directive, standard regime
Source
Estimated value
€1,300,000
Publication date
27 Sept 2026, 23:00

Overview

The stretch of the River Liffey near Islandbridge, is home to over 13 Rowing Clubs – one of which belongs to Dublin City Council. In order to link the eastern length of the Liffey from Islandbridge, the Community, Culture and Local Area Services Department of Dublin City Council has obtained planning permission for an access walkway and pontoon to be constructed on one of the small islands east of the weir. This will allow rowers starting at Islandbridge to have access down to Ringsend and vice versa safely. The project comprises a pontoon with associated walkways to facilitate access to the river for rowing boats and kayaks. The project will provide for a platform that would minimize damage to bankside vegetation when launching and retrieving boats and allow a safe platform for kayakers and boaters to embark and disembark. The Islandbridge location has extensive heritage and ecology. In keeping with this, minimal deviation from the existing design and methodology is required to comply with planning regulations. The works proposed plan to combine the following elements: a) A floating pontoon system within the River Liffey anchored to the existing island shore. b) A new stone and concrete platform built out from the riverbank and connected to the pontoon by a new gangway. c) The removal of vegetation on approach to the pontoon and installation of a new access walkway from the south upper River Liffey at the weir to the new pontoon located north on the lower River Liffey. d) The temporary removal, refurbishment and reinstatement of an existing steel footbridge located on the island. e) The removal of poor existing vegetation, pruning of existing healthy trees and the replanting of 25 new high-quality trees and growing shrubs all native to Ireland. f) Temporary regrading of land during site works for access onto the island. . Please note that this project is subject to funding. For further information please refer to documentation available to download from www.etenders.gov.ie Resource ID xxxxxxx – Input when notice created.

Contracting authorities1

DC

IE-REGISTRATION-NUMBER IE47732154U

ieDublin, Ireland
[email protected]

Lots1

Documentation4

4 documents
  • Dublin City Council Contract for Architect Led Integrated Design Team for the Installation of a Pontoon at Islandbridge (notice).pdf

    PDF document

    2.0 MB
  • c4t_9113337_1.xml

    XML document

    816 B
  • Additional Information.pdf

    PDF document

    150.8 KB

Award criteria0

No procedure-level award criteria recorded.

Participants0

No participants recorded for this notice.