DoV Framework agreement Tunnel and rock protection 2026-2028

cn-standardContract or concession notice – standard regime00433208-2026SVStatens vegvesen
30 days left
Estimated valueNOK 300,000,000
Deadline30 days left14 Aug 2026, 10:00
Competition00 participants
Lots22 lots

Track this opportunity

Register to add pursuits, save this notice, and get alerts when similar tenders appear.

  • Save and reuse search filters
  • Track opportunities as pursuits
  • Get notified when new notices match
Quick actions
Receive alerts

Key information

Identifier
00433208-2026
Contract type
Deadline
14 Aug 2026, 10:00
CPV codes
45000000 - Construction work45111212 - Rock-removal work45221200 - Construction work for tunnels, shafts and subways45221241 - Road tunnel construction work45233139 - Highway maintenance work
Status
Active
Notice type
cn-standardContract or concession notice – standard regime
Source
Estimated value
NOK 300,000,000
Publication date
24 Jun 2026, 22:00

Overview

The Norwegian Public Roads Administration Operations and Maintenance invites tenderers to a competition for the following contract work: Framework agreement for tunnel and rock protection for Trøndelag, Møre og Romsdal. The contract includes cleaning and bolting protection, establishing of new and improving existing water and frost protection in tunnels, clearing and bolt protection in cuttings, establishing different types of meshes (ice nets, erosion network etc.), improvements and establishment of new security measures in the open air on European and national roads. in Trøndelag, Møre og Romsdal. The measures will vary in extent. Outside of general processes, a couple of concrete projects are described to be carried out: TR01: E6 Kvam – clearing and work protection cutting. Modification of the existing network TR02: E6 Cleansed - clearing and work securing cutting. Assembly of an ice network. TR03: E39 Søvassdalen - clearing and work securing cutting. Assembly of an ice network. MR01:E39 Brusdalen – clearing and work securing cutting. MR03: E136 Sørnes tunnel – Rensk and securing, establishment of a new water-frost protection vault. Consideration shall be given to set timetables for public transport. Routines must be established. for emergency emergency services. All traffic deviations/driving vehicles in tunnels shall be carried out for work. passing must be clarified by the traffic conductor with work teams in the tunnel before emergency services are released. through. There will be a lot of focus on the contract work notification as the work is ongoing on the existing road network. The location of the traffic conductor shall always be risk assessed in the contractor ́s work warning plan. The contracting authority would like parallel framework agreements with up to 3 contractors per area, based on which tender is best in accordance with the award criteria.

Quick actions
Receive alerts
Timeline

22 Jun 2026, 14:13

Dispatch date

Milestone

24 Jun 2026, 22:00

Publication date

Publication

14 Aug 2026, 10:00

Submission deadline

Deadline

Version history

None recorded.

Contracting authorities1

SV

UNKNOWN 971032081

noMoss, Norway
[email protected]

Lots2

Documentation0

The source system does not support document syncing.

Award criteria0

No procedure-level award criteria recorded.

Participants0

No participants recorded for this notice.