Deliver a high-quality, visionary Masterplan for the site known as Smiths Field, and the development of a detailed Part 8 design proposal to meet the needs of the community in Mountmellick, Co. Laois

E4National Below Threshold Contract Award Notice (CAN)751fd15a-7c1d-4f74-85ba-3d076fe655f0LCLaois County Council
Estimated value€49,800
Deadline
Competition11 participant
Lots11 lot

Keep momentum on this opportunity

Save it on this device now. Create an account when you are ready to track deadlines, notes, and teamwork.

  • Save and reuse search filters
  • Track opportunities as pursuits
  • Get notified when new notices match
Quick actions

Keep this notice in a shortlist so you can return to it without starting a bid.

Keep notes, monitor deadlines and collaborate with your team. This does not submit a bid or contact the buyer.

Receive alerts

Key information

Contract type
Deadline
CPV codes
71000000 - Architectural, construction, engineering and inspection services71200000 - Architectural and related services71240000 - Architectural, engineering and planning services71300000 - Engineering services71400000 - Urban planning and landscape architectural services
Status
Awarded
Notice type
E4National Below Threshold Contract Award Notice (CAN)
Source
Estimated value
€49,800
Publication date
4 Sept 2026, 13:52

Overview

LCC is seeking to procure the services of an Urban Landscape led integrated design team to develop a masterplan for Smiths Field and to administer a Part 8 planning process for the preferred development option. The area is envisioned to be sustainable, inclusive, and well-integrated with the existing urban fabric. As part of the masterplan and Part 8, the appointed design team will be required to assess options for a new pedestrianised route / connectivity between Smiths Field and the town. The Masterplan will complement and build on three other developments taking place at this location, Laois County Council is currently designing a social housing scheme adjoining the location, Mountmellick Soccer Club is to upgrade their facilities to the north of Smiths field, and Laois County Council has recently constructed an active travel footpath along the perimeter of the site. It is envisaged that further active travel measures will be incorporated by the appointed design team into the masterplan for Smiths Field with a view to improving connectivity with Mountmellick Town. The Masterplan and Part 8 design will enable the development of an improved natural amenity area in a very central location for the people of Mountmellick. The design should incorporate new passive and active open spaces which will strengthen the network of existing green space within the Town Centre environment, Strengthen the network of open space amenities in the Town and enhance connectivity between them, Introduce biodiversity and climate resilience measures within the town whilst taking into the SAC conservation objectives of the River Owenass

Contracting authorities1

LC

IE-REGISTRATION-NUMBER 0506615J

iePortlaoise, Ireland
[email protected]

Lots1

Documentation10

10 documents

Award criteria0

No procedure-level award criteria recorded.

Participants1