Decarbonisation of Heating Systems at Fota House: Bivalent Air-to-Water Heat Pump Installation

cn-standardContract or concession notice – standard regime00372431-2026ITIrish Heritage Trust
Estimated value€350,000
DeadlineExpired3 Jul 2026, 12:00
Competition00 participants
Lots11 lot

Keep momentum on this opportunity

Save it on this device now. Create an account when you are ready to track deadlines, notes, and teamwork.

  • Save and reuse search filters
  • Track opportunities as pursuits
  • Get notified when new notices match
Quick actions

Keep this notice in a shortlist so you can return to it without starting a bid.

Keep notes, monitor deadlines and collaborate with your team. This does not submit a bid or contact the buyer.

Receive alerts

Key information

Identifier
Contract type
Deadline
3 Jul 2026, 12:00
CPV codes
45351000 - Mechanical engineering installation works42511110 - Heat pumps71314100 - Electrical services
Status
Active
Notice type
cn-standardContract or concession notice – standard regime
Source
Estimated value
€350,000
Publication date
31 May 2026, 22:00

Overview

The Irish Heritage Trust (IHT) is seeking a qualified contractor to supply, install, and commission a high-efficiency low-carbon heating solution at Fota House, Carrigtwohill, Co. Cork. This project is part of a wider sustainability initiative to replace the existing obsolete oil-fired heating system with a renewable bivalent solution while strictly adhering to the conservation requirements of a protected heritage property. The scope of works includes: • Heat Pump Installation: Supply and installation of three (3) 50 kW R290 air-to-water monoblock heat pumps. • Bivalent System Integration: Modifying the existing piping network to integrate the new heat pumps with the recently installed natural gas (NG) condensing boilers, which will remain for peak-load and backup support. • Ancillary Components: Installation of a 1000L buffer tank, new pumps, mixing valves, magnetic filters on each circuit, and flow/return headers. • Controls and BMS: Complete integration of the heat pump system with the existing Building Management System (BMS), including the installation of internal control modules (e.g., NeoBox) for real-time demand management and digital monitoring. • Metering: Installation of MID-approved energy meters (heat and electrical) as specified in the technical designs. • System Refurbishment: Targeted replacement of specific underground radiant coils and modification of high-risk sections of the existing heating infrastructure.

Contracting authorities1

IT

UNKNOWN IE422959

ieDublin, Ireland
[email protected]

Lots1

Documentation0

The source system does not support document syncing.

Award criteria0

No procedure-level award criteria recorded.

Participants0

No participants recorded for this notice.