Danby Lodge overflow car park construction and groundworks Award Notice

13 days left
Estimated value—
Deadline13 days left4 Nov 2026, 23:59
Competition00 participants
Lots11 lot

Keep momentum on this opportunity

Save it on this device now. Create an account when you are ready to track deadlines, notes, and teamwork.

  • Save and reuse search filters
  • Track opportunities as pursuits
  • Get notified when new notices match
Quick actions

Keep this notice in a shortlist so you can return to it without starting a bid.

Keep notes, monitor deadlines and collaborate with your team. This does not submit a bid or contact the buyer.

Receive alerts

Key information

Identifier
Contract type
—
Deadline
4 Nov 2026, 23:59
CPV codes
45000000 - Construction work
Status
Complete
Notice type
UK6Contract award notice
Estimated value
—
Publication date
21 Oct 2026, 11:31

Overview

The North York Moors National Park Authority has undertaken a number of significant improvements at Danby Lodge in recent years as part of a wider strategy to enhance the site as a flagship visitor destination and support the Authority's second statutory purpose of promoting opportunities for the understanding and enjoyment of the National Park. To support these improvements and accommodate increasing visitor demand, the Authority is seeking to improve the existing overflow car park through the installation of a reinforced hardstanding surface capable of year-round use. The proposal will provide approximately 60 parking spaces within the footprint of the existing overflow parking area, which has been used for many years during periods of high visitor demand and to support events hosted at Danby Lodge. The development will utilise a permeable cellular reinforcement system with a stone-filled finish, creating a durable, weather-resistant surface whilst retaining a natural appearance appropriate to its National Park setting. The design has been developed to minimise visual impact and protect surrounding environmental interests. Surface water will continue to be managed through the existing drainage infrastructure, with runoff directed into the French drain network installed as part of previous site improvement works. The permeable nature of the proposed surfacing will assist with drainage and reduce ground disturbance associated with the current grassed surface. The proposed works have also been designed to avoid any impact on the existing ground source heating infrastructure located beneath the site. The reinforced surface will be constructed above the buried ground source pipe network, ensuring the continued operation and protection of this renewable energy system. The successful contractor will be expecting to work closely with our woodland and ecology Officers to ensure that approved plan is carried out as approved

Procurement Act 2023

Below threshold - open competition

Lot 1: Bids: 13 Lot 1: Final stage bids: 13 Lot 1: Sme final stage bids: 13 Lot 1: Vcse final stage bids: 0

Contracting authorities1

NA

PPON PGXC-2897-MQXX

gbHelmsley, United Kingdom
[email protected]

Lots1

Documentation0

Documents have not been synced yet. Last checked 22 Oct 2026, 04:55.

Award criteria0

No procedure-level award criteria recorded.

Participants1