Contractor for Additional Accommodation Reconfiguration and In-Fill Works to provide 1x Art Room, 1x Woodwork room and preparation area to Presentation Secondary School, Ballyphehane, Cork.

EF16Contract notice – general directive, standard regimef542251f-8f75-4b01-b701-57412ae71f1dP(Presentation Secondary School (Ballyphehane)
14 days left
Estimated value€500,000
Deadline14 days left17 Aug 2026, 11:00
Competition00 participants
Lots11 lot

Track this opportunity

Register to add pursuits, save this notice, and get alerts when similar tenders appear.

  • Save and reuse search filters
  • Track opportunities as pursuits
  • Get notified when new notices match
Quick actions
Receive alerts

Key information

Contract type
Deadline
17 Aug 2026, 11:00
CPV codes
45214220 - Secondary school construction work45210000 - Building construction work45213252 - Workshops construction work45214200 - Construction work for school buildings
Status
Active
Notice type
EF16Contract notice – general directive, standard regime
Source
Estimated value
€500,000
Publication date
2 Aug 2026, 23:00

Overview

The proposed development consists of Reconfiguration Works to provide •1 No. Conversion of Existing Home Economics Room in to Art Room (96.5m²), •1 No. Conversion of Existing Art Room in to Wood Technology Room (99.5m²), •In-Fill construction providing a Wood Machining and Preparation Room of 30m² area. The proposed reconfiguration layouts make the maximum use of the existing available space within the existing classrooms and the additional in-fill Wood Machining and Preparation Room slots within the existing footprint of the building.

Quick actions
Receive alerts
Timeline

02 Aug 2026, 23:00

Notice dispatch/publication date

Publication

17 Aug 2026, 11:00

Deadline for requesting additional information

Deadline

24 Aug 2026, 11:00

Deadline for receipt of tenders

Deadline

Version history

None recorded.

Contracting authorities1

P(

IE-REGISTRATION-NUMBER 62693K

ieBallyphehane, Ireland
[email protected]

Lots1

Documentation2

2 documents
  • Contractor for Additional Accommodation Reconfiguration and In-Fill Works to provide 1x Art Room, 1x Woodwork room and preparation area to Presentation Secondary School, Ballyphehane, Cork. (notice).pdf

    PDF document

    2.0 MB
  • c4t_8758860_1.xml

    XML document

    803 B

Award criteria0

No procedure-level award criteria recorded.

Participants0

No participants recorded for this notice.