Consulting Services for Feasibility Studies, Preliminary Engineering Design and ESIA/RAP Studies for Cadale-Warshiikh (80km) and Ceel Macaan – Ceseleey – Balcad (60km) in Hirshabelle State

Estimated valueUS$1,500,000
Deadline—
Competition55 participants
Lots00 lots
Quick actions

Keep this notice in a shortlist so you can return to it without starting a bid.

Keep notes, monitor deadlines and collaborate with your team. This does not submit a bid or contact the buyer.

Receive alerts

Key information

Identifier
Contract type
—
Deadline
—
CPV codes
—
Status
Awarded
Notice type
Contract AwardContract award
Estimated value
US$1,500,000
Publication date
9 Oct 2026, 00:00

Overview

Consultancy Services for Feasibility Studies, Preliminary Engineering Designs and Environment and Social Impact Assessment (ESIA) Studies for Cadale-Warshiikh (80km) and Ceel Macaan-Ceseleey-Balcad (60km) in Hirshabelle State

P173119 – Somalia - Horn of Africa Infrastructure Integration Project (Somalia, Federal Republic of, Eastern And Southern Africa)

IDA-E1270

SO-MPWRH-521449-CS-QCBS

Quality And Cost-Based Selection (QCBS); market approach: Open, International

Trade Rural and Inter-Urban Roads Public Administration - Transportation Ports/Waterways Fisheries

81101500 Civil engineering 81101510 Highway engineering

English

Notification of award issued: 2026-10-06 Duration of contract: 6 Month(s) Minimum qualifying score: 80

awarded: GIBB AFRICA LTD (1008387), Kenya — final evaluation price USD 1490418; signed contract price USD 1490418 evaluated: AMA CONSULTING ENGINEERS LTD (1008379), Kenya — final evaluation price USD 1643160200 evaluated: BATCH ASSOCIATES LIMITED (1013848), Kenya — final evaluation price USD 1705673.1 rejected: DT GLOBAL INC (1013851), United States — reason for rejection: Failure to meet minimum technical score rejected: UB CONSULTING ENGINEERS LTD (1008391), Kenya / UNITED CONSULTING ENGINEERS PLC (1008392), Ethiopia — reason for rejection: Unavailability of key experts

Contracting authorities1

Lots0

No lots recorded for this notice.

Documentation0

The source system does not support document syncing.

Award criteria0

No procedure-level award criteria recorded.

Participants5