Construction of Zaghloul El Bahary Wastewater Treatment Plant (WWTP), Design – Build, Defect Liability Year, and Optional One (1) Year of Operation and Maintenance

can-standardContract or concession award notice – standard regime00607930-2026K(Kafr El-Sheikh Water Supply and Sanitation Company (KSWSSC), Project Implementation Unit (PIU)
Estimated value€23,000,000
Deadline—
Competition00 participants
Lots11 lot

Keep momentum on this opportunity

Save it on this device now. Create an account when you are ready to track deadlines, notes, and teamwork.

  • Save and reuse search filters
  • Track opportunities as pursuits
  • Get notified when new notices match
Quick actions

Keep this notice in a shortlist so you can return to it without starting a bid.

Keep notes, monitor deadlines and collaborate with your team. This does not submit a bid or contact the buyer.

Receive alerts

Key information

Identifier
Contract type
—
Deadline
—
CPV codes
45200000 - Works for complete or part construction and civil engineering work
Status
Awarded
Notice type
can-standardContract or concession award notice – standard regime
Source
Estimated value
€23,000,000
Publication date
2 Sept 2026, 22:00

Overview

The work to be carried out under this works contract comprises the permanent works (facilities and systems) related to the new Zaghoul El Bahary WWTP (15,000 m3/d, 2037 expanded to 25,000 m3/d, 2052) in Motobas District, Kafr El Sheikh Governorate, to be designed, constructed, and commissioned; the effective restoration of any defects during the 1-year Defects Liability Period; and the optional 1-year of normal operation and maintenance of the works for the WWTP. The contract comprises also the provision of training services to the Procuring Entity’s personnel duly completed within the Defects Liability Period or the Optional 1 year Operation and Maintenance Period as the case may be, and before the works hand-over. Some minor works of the Plant has been executed by another Contractor in a previous phase. Although not part of the Works, the Contractor shall be aware of its obligations toward these Existing Works as defined in the Contract Documents.

Contracting authorities1

Lots1

Documentation0

The source system does not support document syncing.

Award criteria0

No procedure-level award criteria recorded.

Participants0

No participants recorded for this notice.