Connection of Townawilly Group Water Scheme Co-Operative Society to the Public Water Supply

EF29Contract award notice – general directive, standard regime79725b07-5b01-4f61-942a-38dfd3e14b2cDCDonegal County Council_1193
Estimated value€30,000
Deadline
Competition11 participant
Lots11 lot

Track this opportunity

Register to add pursuits, save this notice, and get alerts when similar tenders appear.

  • Save and reuse search filters
  • Track opportunities as pursuits
  • Get notified when new notices match
Quick actions
Receive alerts

Key information

Identifier
79725b07-5b01-4f61-942a-38dfd3e14b2c
Contract type
Deadline
CPV codes
45231100 - General construction work for pipelines
Status
Awarded
Notice type
EF29Contract award notice – general directive, standard regime
Source
Estimated value
€30,000
Publication date
30 Jun 2026, 23:00

Overview

This project involves upgrading and restructuring the water supply infrastructure in the Townawilly area. The aim is to improve water quality, ensure compliance with regulatory standards, and deliver a more efficient and reliable water network. The contract includes the design and construction of an interconnector water main to connect the existing scheme to the Public Water Supply Scheme (PWSS) operated by Uisce Éireann (UÉ), which will allow for the decommissioning of the Townawilly Group Water Scheme (GWS) Water Treatment Plant. The contract also involves key upgrades to UÉ infrastructure, including construction of new watermain connections and a new booster pump station (PS) at the Glencoagh Storage Reservoir (SR) site to serve both the Glencoagh and Eddrim Glebe networks. Additionally, the Eddrim Glebe PS will be upgraded with new pumps and a change in the pumping arrangement.

Quick actions
Receive alerts
Timeline

10 Jun 2026, 23:00

Contract conclusion

Award decision

30 Jun 2026, 23:00

Notice dispatch/publication date

Publication

Version history

None recorded.

Contracting authorities1

DC

IE-REGISTRATION-NUMBER 8F28103W

ieLifford, Ireland
[email protected]

Lots1

Documentation11

11 documents
  • Connection of Townawilly Group Water Scheme Co-Operative Society to the Public Water Supply (notice).pdf

    PDF document

    2.0 MB
  • QW2-Appendix-A-Applicants-Self-Declaration-re-Regulation-57.docx

    Word document

    43.3 KB
  • Townawilly Appropriate Assessment Screening and Natura Impact Statement.pdf

    PDF document

    2.4 MB
  • Townawilly Archaeology and Built Heritage Screening.pdf

    PDF document

    2.1 MB
  • QW2-Appendix-B3-Certificate-of-Satisfactory-Delivery-of-Services.docx

    Word document

    30.8 KB
  • QW2-Appendix-B2-Certificate-of-Satisfactory-Project-Execution.docx

    Word document

    31.6 KB
  • Civil Engineering Works designed by the Contractor (PW-CF4-v2.7-01-05-2024).pdf

    PDF document

    1.3 MB
  • Townawilly GWS -Geophysical Survey Report.pdf

    PDF document

    1.3 MB
  • Form of Tender and Schedule.pdf

    PDF document

    533.4 KB
  • Townawilly GWS -Ground Investigation Report.pdf

    PDF document

    11.1 MB
  • QW2-3.4.2-HS-PSCS.pdf

    PDF document

    349.7 KB

Award criteria2

Criterion information

Name
Cost
Weight
50% (50 of 100)
Order number
#0
Price criterion
Yes
Directly proportional
No
Description
cost @ 50%
Algorithm
Weight (percentage, exact)

Participants1