Caherline Newtown Group Water Scheme - Network Upgrade
Keep momentum on this opportunity
Save it on this device now. Create an account when you are ready to track deadlines, notes, and teamwork.
- Save and reuse search filters
- Track opportunities as pursuits
- Get notified when new notices match
Keep this notice in a shortlist so you can return to it without starting a bid.
Keep notes, monitor deadlines and collaborate with your team. This does not submit a bid or contact the buyer.
Key information
Overview
(a) Construction of approximately 870 m of 110 mm O.D. PE100 SDR11 distribution main, constructed by trenchless technique method such as Horizontal Directional Drilling, constructed in the R513 Regional Road; (b) Construction of approximately 2042 m of 110 mm O.D. PE100 SDR11 distribution main, constructed in Local Secondary Road, constructed by trenchless technique method such as Horizontal Directional Drilling; (c) Construction of approximately 601 m of 110 mm O.D. PE100 SDR11 distribution main in Local Secondary Road, constructed by open dig method
Lots1
Documentation10
- 2.0 MB
Caherline Newtown Group Water Scheme - Network Upgrade (notice).pdf
PDF document
- 303.7 KB
25023-TJOC-XX-XX-TD-C-7029_ITT.pdf
PDF document
- 455.9 KB
- 3.5 MB
25023-TJOC-XX-XX-TD-C-7030_Vol_A1.pdf
PDF document
- 4.2 MB
25023-TJOC-XX-XX-TD-C-7035_Vol_A2.pdf
PDF document
- 1.3 MB
25023-TJOC-XX-XX-TD-C-7026_Vol_B.pdf
PDF document
- 1.6 MB
25023-TJOC-XX-XX-TD-C-7027_Vol_C.pdf
PDF document
- 20.7 MB
25023-TJOC-XX-XX-TD-C-7028_Vol_E.pdf
PDF document
- 774.4 KB
25023-TJOC-XX-XX-TD-C-7034_Vol_D.pdf
PDF document
- c4t_8704674_1.xml803 B
XML document