Building Flood Resilience with Nature Based Solutions in Tula River System, Mexico

Estimated value
Deadline
Competition00 participants
Lots11 lot

Keep momentum on this opportunity

Save it on this device now. Create an account when you are ready to track deadlines, notes, and teamwork.

  • Save and reuse search filters
  • Track opportunities as pursuits
  • Get notified when new notices match
Quick actions

Keep this notice in a shortlist so you can return to it without starting a bid.

Keep notes, monitor deadlines and collaborate with your team. This does not submit a bid or contact the buyer.

Receive alerts

Key information

Contract type
Deadline
CPV codes
75210000 - Foreign affairs and other services45240000 - Construction work for water projects
Status
Active
Notice type
EFE1Voluntary prior market consultation notice
Source
Estimated value
Publication date
4 Sept 2026, 08:08

Overview

Mexico is seeking to transition toward a modern flood management model that integrates controlled flood zones, restored floodplains, and nature-based solutions, following recent events that have exposed the limitations of traditional grey infrastructure. In this context, the Tres Culturas corridor in the Tula River basin presents a unique opportunity to demonstrate this shift in practice: a designed floodplain that reduces urban flood risk while generating ecological, cultural, and social benefits. Aligned with the restoration of the Tula River, one of the President’s 100 national commitments, the project has the potential to become a flagship success case and catalyze large-scale transformation in flood management across Mexico. To realize this opportunity, this assignment aims to contract a single qualified party, a principal contractor–subcontractor structure, or a consortium to provide technical and operational advice for the design of nature-based solutions addressing the hydrodynamics of the Tula River in the Tres Culturas Corridor. The core of the assignment will be to transform modelling data (provided by Inter American Development Bank -IDB-) into a safe, implementable and institutionally supported design, ensuring measurable reductions in flood risk while integrating long-term environmental and social co-benefits. The purpose of the project, its goals, activities and deliverables are outlined in the terms of reference, which is attached as Appendix 1. The content of this ToR document is not final and may be modified by RVO in case of a tender. In case you possess demonstrable experience in similar projects you are invited to express your interest to the contact person mentioned below. Please fill out the questions outlined in the table on the next page. €110.600

Contracting authorities1

Lots1

Documentation3

3 documents
  • TN610346 - EFE1 Vrijwillige aankondiging van voorafgaande marktconsultatie 20260904100802.pdf

    PDF document

    183.3 KB
  • TOR MO Tula River_Version 1.pdf

    PDF document

    215.4 KB
  • 20267107 Marktorientation Tula River.pdf

    PDF document

    154.1 KB

Award criteria0

No procedure-level award criteria recorded.

Participants0

No participants recorded for this notice.