Barbican Renewal Programme - Demolition and Structures
Keep momentum on this opportunity
Save it on this device now. Create an account when you are ready to track deadlines, notes, and teamwork.
- Save and reuse search filters
- Track opportunities as pursuits
- Get notified when new notices match
Keep this notice in a shortlist so you can return to it without starting a bid.
Keep notes, monitor deadlines and collaborate with your team. This does not submit a bid or contact the buyer.
Key information
Overview
Demolition and Structures — Barbican Renewal Programme. Refurbishment and alteration to an existing, occupied Grade II listed Brutalist concrete building (1965–1982) — not new-build; minimal structural intervention philosophy, using existing capacity and justifying retained elements without strengthening wherever possible. The project comprises demolition, enabling, temporary works and primary structural design and construction across the Renewal Phase 1 work areas, together with a sitewide Contractor Design Portion (CDP) framework covering secondary/tertiary steelwork, non-loadbearing masonry, builders work openings, steel reuse and other structure-adjacent design responsibilities. This package also carries a defined allocation of architectural fabric-removal (“Advanced Works”) scope and a smaller number of new internal partition and screed items prepared by the Architect, allocated to this package because they precede, depend upon, or are structurally coincident with the demolition and structural strip-out sequence. • Infrastructure and Sitewide Structural Works. • Conservatory: Level 3 demolition/strengthening. • Foyers: Foyers Bridge steelwork dismantling/re-decking, Foyer Shop demolition, shaft-opening coordination. • Catering Block: Shaft 08–11 slab modifications across multiple levels • Stair 8: structural coordination
Renewal: Extensions may be used if there is programme overrun due to unforeseen events, such as discoveries. Options: • Shaft access equipment and walls/doors/floors strip-out (Infrastructure — with MEP) • General strip-out demarcation — Conservatory, Foyers, Catering Block, Art Gallery Foyers (with MEP) • Facade-related strip-out and asbestos coordination (Conservatory & Stair 8) • Foyer soft-strip and /fit-out demarcation (Foyers with Fit Out Contractor)
Procurement Act 2023
Competitive flexible procedure
This tendering exercise is being undertaken using the electronic tendering system ‘City of London Corporation Sourcing & Contracts Portal’ (https://cityoflondon.ukp.app.jaggaer.com/). Suppliers will need to register an interest on the system in order to participate and registration is free