Art Programme Principal Contractor

UK7Contract details notice099106-2026NMNatural History Museum
Estimated value—
Deadline—
Competition00 participants
Lots11 lot

Keep momentum on this opportunity

Save it on this device now. Create an account when you are ready to track deadlines, notes, and teamwork.

  • Save and reuse search filters
  • Track opportunities as pursuits
  • Get notified when new notices match
Quick actions

Keep this notice in a shortlist so you can return to it without starting a bid.

Keep notes, monitor deadlines and collaborate with your team. This does not submit a bid or contact the buyer.

Receive alerts

Key information

Identifier
Contract type
—
Deadline
—
CPV codes
32321200 - Audio-visual equipment45212313 - Museum construction work
Status
Complete
Notice type
UK7Contract details notice
Estimated value
—
Publication date
20 Oct 2026, 14:10

Overview

The Natural History Museum wishes to secure the services of a Principal Contractor to undertake the build of setworks for an upcoming exhibition featuring art work from Sir John Akomfrah.

Procurement Act 2023

Direct award • Bild is already mobilised on site, undertaking the deinstallation of Our Story within the same gallery space. • The services required for Arcadia closely align with those currently being delivered by Bild. • Appointing Bild will generate efficiencies and reduce hire costs, as equipment and resources can be utilised across both projects. • Through their installation of rigging and setworks for Our Story, Bild has developed proven methodologies for working at height within the Jerwood Gallery. Their familiarity with the gallery's conservation-related restrictions, particularly the limitations on scissor lift size and weight, removes the need for additional familiarisation and planning, enabling them to meet the compressed construction and building control approval programme. • The Arcadia exhibition design retains the lighting layout provided by BIld for Our Story, with some replacement of the hardware required. As Bild is already familiar with the lighting specification, power distribution, and installation requirements, appointing them reduces the extent of electrical works required and mitigates technical risk. • Deinstallation efficiency at the end of Arcadia will also be improved by having a single contractor responsible for all setworks, both reused and newly installed. This avoids the complexity of coordinating multiple contractors and provides clear accountability for removal and reinstatement works. Summary Appointing Bild as Principal Contractor provides continuity of responsibility for proprietary setworks that they own and will reclaim, while also delivering cost, programme, and operational efficiencies through the reuse of existing resources and their familiarity with the site.

Contracting authorities1

NM

PPON PJBJ-4723-MZPX

gbLondon, United Kingdom
[email protected]

Lots1

Documentation0

Documents have not been synced yet. Last checked 21 Oct 2026, 22:07.

Award criteria0

No procedure-level award criteria recorded.

Participants1